My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017/12/20 Council Agenda Packet
>
Council Agenda Packets
>
2017
>
2017/12/20 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2018 10:07:37 AM
Creation date
1/8/2018 10:06:36 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/20/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit "A"—Scope of Services <br /> City of Everett <br /> Riverfront Development—GEC Management, Survey, and Mapping <br /> INTRODUCTION <br /> This task involves providing survey and engineering assistance to the City of Everett in support of Riverfront Development <br /> projects. Included in this task is survey and mapping,cost estimating,and general and detailed engineering on an as- <br /> needed basis. <br /> SCOPE OF SERVICES <br /> Project Support and Management <br /> The scope of services for engineering design and technical to the City of Everett in support of the Riverfront Development. <br /> Perteet will provide consulting,develop cost estimates,and provide details and general engineering on an as needed basis. <br /> As requested by the City,tasks include: <br /> 1. PROJECT SUPPORT AND MANAGEMENT <br /> Project Support <br /> 1.1. Attend meetings with City and developers <br /> 1.2. Update the overall cost of current and future Riverfront projects <br /> 1.3. Provide quantity take offs and cosi estimates of projects <br /> 1.4. Provide drawings and details in support of the City's comments - <br /> 1.5. Provide general consulting in support of the Riverfront Development <br /> Project Management <br /> 1.6. Prepare monthly billings,progress reports,including an updated monthly project schedule. <br /> 1.7. Attend weekly coordination/discussion meetings with key City staff,and attend other meetings as needed. <br /> 1.8. Maintain on-going contact with the City's Project Manager via informal meetings,telephone discussions,and <br /> electronic mail. <br /> 1.9. Perform quality control and assurance procedures on project deliverables. <br /> 1.10.Perteet will provide overall coordination of the project between City staff and Perteet staff,as well as schedule <br /> and coordinate with consultant and subconsultants personnel and equipment. <br /> Project Evergreen Support Task No.018 Page 2 of 3 <br /> X:\Everett,City of\Projects\27014-Everett Riverfront Development\000 GEC •.•act\Contracts\Task 018_Project Evergreen Support 6-5- <br /> 17\Supplement\GEC Managment TASK ORDER 018 Main Supplement 1 v2.1.. • <br />
The URL can be used to link to this page
Your browser does not support the video tag.