My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017/12/20 Council Agenda Packet
>
Council Agenda Packets
>
2017
>
2017/12/20 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2018 10:07:37 AM
Creation date
1/8/2018 10:06:36 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/20/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 1 <br /> • <br /> PROJECT TITLE: <br /> Amendment No. 2 to _ Briefing COUNCIL BILL# <br /> Professional Services Proposed Action Originating Department Public Works <br /> Agreement with Stantec X Consent Contact Person Richard Heffi <br /> Consulting Services,Inc.to Action Phone Number (425)257-7215 <br /> Provide Additional Services First Reading FOR AGENDA OF December 20,2017 <br /> for the Three Lakes Valve Second Reading <br /> Bypass Project Third Reading <br /> Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA <br /> Council President dr <br /> Location Preceding Action Attachments Department(s)Approval <br /> East of Snohomish off Professional Services Amendment No. 2 Public Works <br /> Three Lakes Road Agreement—October 24, <br /> • 2016. Amendment 1 — <br /> April 26,2017 <br /> Amount Budgeted $1,500,000 Fund 336 <br /> Expenditure Required $4,000 Account Number(s): UP-3611 <br /> Budget Remaining $137,268.66 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> The Three Lakes Pressure Sustaining/Reducing Valve is a critical component of the water Transmission <br /> Line 5 (TL5) operation. This project will provide a bypass around the Three Lakes Valve that will be used <br /> to allow maintenance on the existing valve structure without having to shut down TL5. This project is <br /> currently under construction, scheduled for completion by April 2018. <br /> Stantec Consulting Services, Inc.has been providing design and construction engineering services for this <br /> project and is approaching their contract limit. Their services are still required throughout the remainder <br /> of the project construction. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to Sign Amendment No. 2 to the Professional Services Agreement with Stantec <br /> Consulting Services, Inc. to provide additional services for the Three Lakes Valve Bypass Project in an <br /> additional amount of$4,000. <br /> 181 <br />
The URL can be used to link to this page
Your browser does not support the video tag.