My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3316 HOYT AVE B 2018-01-31
>
Address Records
>
HOYT AVE
>
3316
>
3316 HOYT AVE B 2018-01-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2018 9:19:59 AM
Creation date
1/9/2018 9:44:42 AM
Metadata
Fields
Template:
Address Document
Street Name
HOYT AVE
Street Number
3316
Unit
B
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � <br /> 1915 Madison Street <br /> ' ��`"�� ��=-�""'� Everett, Washington 98203 <br /> �� �...._£ <br /> '" ���.-����� Phone: (425) 353-0531 <br /> „ Fax: (425) 353-6086 <br /> �;���..,, ; €�' www.designlines.com <br /> .� �� <br /> May 6, 2016 <br /> Jeff Heilman <br /> City of Everett <br /> 3200 Cedar Street <br /> Everett,WA 98201 <br /> RE: Plan Check No.C1604008 <br /> Dear Sir: <br /> We respond to your letter from April 27t"as follows: <br /> — 1. The window well details on page 5 have been changed to reflect the dimensions of the window <br /> wells that will be used. <br /> ✓�. Note #5 on page 2 addresses this issue. Some verbiage has been added to clarify. Keynote <br /> reference symbols have been added at each faucet for clarification. <br /> — 3. A note requiring R-5 rigid insulation has been added to the building sections on page 5. <br /> — 4. Verbiage has been added to note#6 on page 2 about fire separation and wrapping beams and <br /> columns in type "X" GWB. Gypsum Association is the testing agency. File #FC5120 is the <br /> assembly proposed. <br /> — 5. Section marker on pages 1 &2 have been moved so that it does not cut thru the chimney and <br /> just shows the wall. <br /> -- 6. Item to be addressed by structural engineer. <br /> ✓7. A landing, retaining walls and stairs have been added to page 1 & 2 to deal with the grade <br /> issue. <br /> ✓8. The existing beam is adjacent to the chimney, not running thru it. The plan has been changed <br /> on page 1 &2 to reflect this. <br /> 9. Spans and point loads have been changed to reflect the correct dimensions and locations of <br /> walls that have been moved on page 2. Where conditions and point loads are equal or lower, <br /> the same size beam will be used. The foundation plan has been revised with larger footings <br /> where needed on page 1. <br /> 10. Missing fireblocking information has been added to the sections on page 5. New section has <br /> been added to clarify differences in parallel and perpendicular directions. <br /> Sincerely, � <br /> T.J. Perso e� !".c.-s�— �l�� !��?�L�,�}�d� �,i ,,`. <br /> � <br /> Designer � �UN � � 2�,6 <br /> CITY OF EVERETT <br /> Permit Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.