Laserfiche WebLink
COST E�TIMATE SHEET <br /> Public Works Department Streets Division <br /> 3200 Cedar Street Everett WA 98201 <br /> 425-257-8821 - �ax 425-257-8882 <br /> Date 09/15/2017 <br /> Work Order # �D I f Z`� � io <br /> Service Order # <br /> Contact Person Michael Finch Telephone #206-618-4694 <br /> Requested By <br /> Property Owner (Name) Pacific Avenue Investments <br /> Address: 902 Westminster CI. City Everett, WA. Zip 98203 <br /> Installation Location 1802 Pacific Ave. <br /> Installation type/description Sidewalk; on the Rockefeller side, 100'X 6'X 4" =7.5 Cu. Yd. <br /> On the Pacific side, sidewalk, 26'X 6'X 4" = 2 Cu Yd Driveway apron 18'X 7'X 6" = 2.5 Cu. Yd. This would <br /> be the minimum amount of damaged sidewalk to replace on Pacific, to reqlace all of the sidewalk and <br /> driveways on the pacific would be an additional 8 75 Cu Yd of concrete <br /> The�ollowing estimate is based upon the Street Division work group providing all labor and equipment. <br /> • By signing this estimate you give the City permission to enter upon your private property to use your <br /> outdoor water faucet for the project if a Fire Nydrant or another water source is not available. <br /> Itemiaed Co§t Es�imate: <br /> Labor & Benefits 0 <br /> Material c-s�;—�-E�� $9�-�e+" . <br /> to replace all S/W & D/W concrete; 20.75 cu. yd. @ $98.50 per cu. Yd. $2,043.87 <br /> Surface Restoration 0 <br /> Sales Tax 0 <br /> TOTAL � $ � �'`P j � g"' � <br /> Prepared by: �ob Sorgen Date Estimate Prepared: 09/15/20i7 <br /> Accepted by: �r,;v��Y "t, t�` � �+=�� � Represen�ting: ���-i'� !`��`��- ��u�a- r2�- � <br /> =' (Signature) <br /> ��<�� ��i� i7 <br /> P(ease sign and return esfimate to address above, Attn. Bob Sorgen <br /> ESl'INiATE GOOD FOR 6 M109VTHS <br /> MacintoshHD:Users:jameslanw s:Library:Containers:com.ap L�t1�11a�e o�lly tE95D1:1802PacificSidewalk!COSTESTID�fATE <br /> SIi��Tl_dacx �(� �(-'�� ��q,�n ��TT'.�u <br />