Laserfiche WebLink
� � � <br /> The wind turbine power curve;average annual wind speed at <br /> the site;frequency distribution of the wind speed at the site <br /> and height of the tower. <br /> Footnotes: <br /> 1. Interior Duct Placement: Ducts included as Option 2 of <br /> Table 9-1 shall be placed wholly within the heated envelope <br /> of the housing unit. The placement sl�all be inspected and <br /> certified to receive the credits associated with this option. <br /> EXCL-'P7'[ON: <br /> Ducts complying with this section may have up to 5% of the <br /> total linear feet of ducts located in the exterior cavities or <br /> buffer spaces of the dwelling. If this exception is used the <br /> ducts will be tested to the following standards: <br /> Post-construction test: Leakage to outdoors shall be less than <br /> or equal to 1 CFM per 100 ft2 of conditioned floor area when <br /> tested at a pressure differential of 0.1 inches w.g. (25 Pa) <br /> across the entire system, including the manufacturer's air <br /> handler enclosure. All register boots shall be taped or <br /> otherwise sealed during the test. <br /> 2. Plumbing Fixtures Flow Ratings. Low flow plumbing <br /> fixtures (water closets and urinals) and fittings (faucets and <br /> showerheads)shall comply with the following requirements: <br /> (a)Residential bathroom lavatory sink faucets: Maximum <br /> flow rate n 3.8 L/min (1.0 gal/min) when tested in <br /> accordance with ASME A 112.18.1/CSA B 125.1. <br /> (b) Residential kitchen faucets: Maximum flow rate ❑ 6.6 <br /> L/min (1.75 gal/min) when tested in accordance with ASME <br /> A] 12.18.1/CSA B125.1. <br /> (c)Residential showerheads: Maximum flow rate ❑ 6.6 <br /> L/min(1.75 gal/min)when tested in accordance with ASME <br /> A112.18.1/CSA E3125.1 <br /> .r- � � <br /> WSEC Prescriptive Worksheet (2010 Edition) WSUEP10-010 Copyright 2010 ��//� <br />