Laserfiche WebLink
' S <br /> _ �Premi�r Commu�i�i�s <br /> 2009 Intended Ener and V�n�ilation Com liance <br /> . Plat:- ��E�tJ �itL� �'A��1�' <br /> Lot Number: 7� <br /> Address: � �}S 1��" �i-i, S� �ve.c�.C� ��.�,� �d �� <br /> Gum�tia�ce MGthoc� FIVAC <br /> Max: �i0,000 BNs/Max N/A Walts <br /> [ ]CH 4 Systems Malysfs-See Attached Flflclency Ratinq 9S% HSPF Ratlng N/A <br /> [ ]CH 5 Component Performanc See A2ttached <br /> [X]CH 6 Prescriptive-OpUon:.�.�;J7% <br /> (See requtrements below) 1/EPITILAT�OIy,_O�T�,O�P�Ft IRC M15Q8(Check One) <br /> [ ]1 -M16o8.4 Intormittent Whole liouso ventilation Using Exhaust Fans <br /> T�bl�6-7.PI'@SCI'1 ve ec�uiraments: DL]2 �!'71508.5 Intormittent Whole House VQntilaYfon Inte:grabed Wlth A Forced A!r Systvm <br /> [ J 3 -M36U8.6 Intermittant Wholo Housv Vontilatlon Using A Supp(y Fan <br /> OPTION 1. IY.* 1IY I l 4 -M1508,y Yntermittent Whola Nouse Ventilation Syrstem Using A Heat Rcjc.Vent 5ystem <br /> Qlaxln4 Area%oP Floor 13% 25% U�r I. Requlred Ventilatlon ttatas <br /> 0(itchan- 100CPM Intc33rmittant or [ ]2S CFM Continuous <br /> Flat Ceiling R-49 R-49 R-49 ���m and 7aflet rooms- 50CFM xnt4tmit�ertt or [ ]20 C�M Continuous <br /> Flat Celling -Adv.Frame R-38 R-38 R-38 <br /> Vaulted Celling R-19 R-49 ��nimum Yontilatlon Rates Por Continuous S�stem per 7able Mx508.2 <br /> 49 ,` � <br /> Vaulted Cefling -Adv.Frame R-38 R-38 R-38 #of Ueclrooms Nouse Sq.Footage ��`/ Conk Required CFM Rate.�,__ <br /> Wail Above Grade-16"o.c. R-21 R-21 R-21 Conversion Formula for Intermittent VentilaCion� <br /> Headers R-10 R-10 R-10 <br /> Wail Befow Grade,int. R-21 R-21 R-21 <br /> Wail Below Grade,Ext R-10 R-10 12-10 Continuous Itequlred CFM Rate��/x(.7x.99=.693)_ � Required CFM'Rate <br /> F1oor over crawl R-30 R-30 R-30 Run tlme calculated at 75%in(3)8 hour cycles-6 hours on and 2 hours ofP <br /> �I�ab on Grade R-10 R-10 Automatic and Manual DampQr to ba set to required CFM's at trim. <br /> Doors U.20 U.20 <br /> U.20 <br /> Wfndows/Vertical Glazing U.34 �,32 U.30 <br /> Skylights/Overhead Glazing U.50 U.50 U.So bUC7 TESTiN�andAxR LEAKAGE T�STXNG <br /> Duct tesUn9 and afr leakage test are requlred Per WSEC 502A.5,503.10.2 and 503.10.3 <br /> EXCEPTION:Duct testing i9 not required with less tltat 8 faet oi'duct in unconditfonsd spa�e Var <br /> Additiorl�l I�nergy Efficiency Requirerpa�nts <br /> Option(s)from WSEC 7ahle 9-1 This homa wlll not have mora than 6'of duct in uncanditfoned space.DucGs will be installed directiy <br /> Th�t provldes at loast x.0 crmdlF. off the bacic of the fureace for bath suppiy and return into Yho conditioned wall cavity bohlnd tha <br /> �1n flirnaca in the garage. <br /> Optlon: _�[�__ Gedit Value: !'�w <br /> Optlorr. __ Gredit Value: Blower poor tes4ing will bo conducted as required. <br /> Total CrndiCs• /-� <br /> See the WSU Energy Extenslon website for mmpliance rools. <br /> h�tp•//www energy wsu edu/Ruil�,inqHfficl�n�E?ne�qtl,Code aspx <br /> G��{TdF�CATI�N of COi�1pLldli�C� <br /> WS�C 105.4: A permanent certificate shali be posted wikhin three Feet of the elecCricai <br /> distribution panei. The certificate shal) be completed by the builder or registered design <br /> professional.The certificate shail list all the predominate R-values of insulation installed in or on <br /> ceiiing/roof, walis, foundation, (slab, basement wall, crawlspace, wall and or floor), and ducts <br /> outside Che condiCtoned spaces; U-Factors for fenestratian; and the solar heaC gain coefficient <br /> (SHGC)of fenestratlon. Where there is more than one valu� for each component, fihe certiflcate <br /> shall list the value covering the largest area. The certificate shal) (ist the type and efficiency of <br /> the heating, cooling and service water heating equfpment, duct leakage rates including test <br /> canditions as specified in 5ection 503.10.2, and air leakage results if blower door test was <br /> conducted. <br /> ��� � <br />