My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3020 36TH ST 2018-01-11
>
Address Records
>
36TH ST
>
3020
>
3020 36TH ST 2018-01-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2018 10:39:59 AM
Creation date
1/11/2018 10:39:52 AM
Metadata
Fields
Template:
Address Document
Street Name
36TH ST
Street Number
3020
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• � <br /> Teresa Weldon <br /> From: Teresa Weldon <br /> Senf: Monday, March 02, 2015 11:41 AM <br /> To: Mary Cunningham <br /> Cc: John Jimerson <br /> Subject: RE: Riverfront EIS Question <br /> Tom stopped by and says: <br /> LS 21 is existing and is just being fenced and landscaped. Not in shoreline area. <br /> LS 43 is new and was called the 'Central Area Lift Station' and is the leachate collection system noted in the EIS under <br /> Add 2 Public Amenities. Not in shoreline area. <br /> LS 33 is existing and is being rebuilt nearby and the old removed.This is in shoreline area and was addressed in the <br /> shoreline permit for the Public Amenities and he believes this work would be covered in the EIS for general utility work. <br /> -----Original Message----- <br /> From: Mary Cunningham <br /> Sent: Monday, March 02, 2015 10:00 AM <br /> To:Teresa Weldon <br /> Cc:John Jimerson <br /> Subject: RE: Riverfront EIS Question <br /> I can't find any specific mention of#43 and#21. But#33 was not addressed in the EIS either and it was covered in the <br /> shoreline permit. The EIS was pretty vague about where utilities would be located. Mainly said they would be provided. <br /> Mitigation measures were vague also: <br /> Coordinate with all utility service providers regarding the location of proposed structures, utilities and site <br /> grading during construction of each phase of redevelopment. <br /> Comply with requirements in the Consent Decree for all activities on the Landfill/Tire Fire site, including <br /> methods for installation of all utilities and services. <br /> Comply with City of Everett Utility system standards and applicable connection fees. <br /> Addendum 2 (Public Amenities)says <br /> The Railroad Corridor Trail is designed and located to accommodate the leachate collection system for the <br /> landfill..... and sewer collection facilities. I don't know if the lift stations are part of this trail? <br /> However, Shoreline permit for the Public Amenities says A sewer lift station was part of a previous shoreline permit (LS <br /> 33), and no general utility facilities are proposed. Utilities would be provided for water, sewer and electrical, and they <br /> would be undergrounded. <br /> Figure 4 in FEIS shows approximate shoreline jurisdiction. <br /> I will go discuss with John. <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.