My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1313 50TH ST SE 2018-01-11
>
Address Records
>
50TH ST SE
>
1313
>
1313 50TH ST SE 2018-01-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2018 11:02:21 AM
Creation date
1/11/2018 11:02:19 AM
Metadata
Fields
Template:
Address Document
Street Name
50TH ST SE
Street Number
1313
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P U 6 L 1 C �O RKS P E RM I T � Date: 10/27/2016 <br /> Public Works Permit#: PW1610-038 <br /> City of Everett Public Works Department <br /> L�,����. 3200 Cedar Street Parent Permit#: <br /> Everett, WA 98201 Planning Reference#: <br /> (425) 257-8810 <br /> Public Works Fee $: $ 65.00 <br /> Other $: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> SORIANO MARIA <br /> 1313 50TH ST SE <br /> EVERETT �/�/q 98203 <br /> PHONE: PHONE: <br /> TAX PARCEL ID# 00410200010100 SITE ADDRESS: 1313 50TH ST SE <br /> REPAVE AND EXPAND EXISTING DRIVEWAY <br /> (10/27/2016 11:06 AM SEF) <br /> Add low landscaping/retaining wall to front yard (<4ft high). <br /> CLAREMONT HEIGHTS BLK 000 D-00 <br /> - LOT 101 <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works <br /> Department dated 10/27/2016. <br /> 5. Contact the City of Everett Public Works Inspector Jim Knappert at 425-339-7404 w <br /> prior to starting construction and with other inspection requests. Call Voicemail i'; [�'� <br /> Inspection Line at 425-257-8881 to schedule an inspecion prior to pouring driveway and M"� <br /> ,.� � <br /> for final approval. ;:°;��-��r__; .�,:. <br /> 6. Install erosion control measures per City of Everett Standards for small parcels and ;' ''_ `�' � <br /> i ..i I <br /> �..; '�..... <br /> remove upon completion of the project prior to final approval of the permit. , O <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto , � <br /> roadway. ' <br /> 8. Protect all existing underground utilities during construction. � �� � Z <br /> 9. Driveway must be paved surface (asphalt/concrete). � � <br /> 10. Driveway width must not exceed 20ft. <br /> � :; 0 <br /> 11. Landscape/Retaining wall shall not exceed 4ft in height. Protect existing water ;;;;�j - ' E..� <br /> service when installing biocks. :_;' ';�, �a��� ' " � <br /> �� �', • :' O <br /> -W �� .�;�? <br /> Public Works Permit Fee Breakdown: � <br /> ,:.::, � <br /> Paving (Curb & Sidewalk Restoration).....$45.00 ` ' <br /> �r�, s w �ri�, �� �� <br /> PW Site Inspection....................................$20.00 <br /> � : w;�, ___��I���.�.. <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless the <br /> City of Everett from any and all claims for damages,costs,expenses,or <br /> ,� , G� ld 'Z� �l ' causes of action that may arise because of installation and maintenance of the <br /> improvement or other right-of-way use hereto applied for and further agrees to <br /> Approved for Construction Da e remove same upon notice from the City and to replace public property <br /> damaged thereby. <br /> FINAL INSPECTION Date ✓����,1 �� ��o� ���_r� �� .�� �_/6 <br /> Approved as Constructed Signature of Applicant Date ' <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br /> ��� <br />
The URL can be used to link to this page
Your browser does not support the video tag.