Laserfiche WebLink
� � <br /> Terri Jorgenson <br /> From: Meg Haley <br /> Sent: Wednesday, May 10, 2017 11:59 AM <br /> To: 'Dustin Thorlakson' <br /> Cc: Terri Jorgenson; Tawnya Herman; Cindy Bergsma; Paul McKee; Tony Lee;James Bronder; Kembra <br /> Landry <br /> Subject: 61703-007 6611 ASSOCIATED Bl_VD Request for a demo permit <br /> I see no problem with obtaining a demo permit for a building permit currently in review. We are just wrapping up some <br /> building corrections to do with the mechanical conditioning of the space. Planning and structural have approved it, <br /> and Dustin can confirm that the demo drawings are already i� the set. Is that correct Dustin? Please reply to all so <br /> that if I am missing something, the contractor knows what he needs to do to pull a demo permit. <br /> I don't see an attached PW permit on the record. <br /> Thanks all! <br /> M� <br /> Meg Haley, RA <br /> Plan Re�i�vv �,rr3-,itec�t <br /> Permit 5ervices, City of Everett WA <br /> Direct: �125-2_r7-c��13 <br /> e-mail mhaley(a�everettwa.gov <br /> F ror�i_Cc,ur��er �'��5-�5::-8:>'10 (Option 8) <br /> everettwa.gov ermits everettwa.�ov/codes everettwa.�ov��tools <br /> ]. <br />