My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3231 BROADWAY 2018-01-11
>
Address Records
>
BROADWAY
>
3231
>
3231 BROADWAY 2018-01-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2018 2:35:26 PM
Creation date
1/11/2018 2:34:56 PM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3231
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � <br /> April 31, 2015 <br /> City of Everett Planning <br /> City o Everett Fire Department <br /> City of Everett Code Compliance <br /> Z u <br /> n <br /> RE: Request for temporary occupancy of residential�floor <br /> Job Address: 3231 Broadway,lames Haugen Owner <br /> To whom it may concern, <br /> I would like to request at this time, a lifting of the condemnation of the 3�d floor residential apartments <br /> for temporary occupancy.A lot of work has taken place to correct conditions notated in the June 27, <br /> 2014 letter. Alt non permitted corrections have been repaired and a verification walk through of the <br /> building by Assistant Fire Marshall Jim Venturo has taken place.Since receiving our permit,the focus of <br /> repair has been the 3�d floor.At this time,the fire escape is now functioning properly and was inspected <br /> on 3/30/2014 and was noted repaired as per plans. Smoke and CO detectors have been installed in all of <br /> the residences and hallway. Exit signs with battery back-up have been installed. Emergency lighting has <br /> been added to the residence main level exiting/entry hallway. Raised letter Braille exit signs have been <br /> ordered and should arrive within a few days. Goldfinch Brothers are working on the windows and said <br /> they should be installed within 30 days.The current windows are inches short of the height requirement <br /> and exceed the width requirement by 25 inches.The net opening of 6%square feet exceeds the <br /> required 5.7. <br /> With the work that has been completed and with the ongoing effort, I believe we have made sufficient <br /> progress in correcting these issues that brought forth the condemnation.The residents that have been <br /> displaced have had to seek other residences for a couple of months and are eager to return to their <br /> previous residence. I have a son that lives in one of the residences and I would not compromise his or <br /> any others safety. <br /> An 11x17 copy of the plans are included that notate in green, items that have been corrected,yellow, , <br /> items that will be completed by next week and the rest of the remaining issues for this permit will be ���' <br /> corrected by the end of April. Bob Wicks, my architect, and I will be meeting this Friday the 3�d at 9:30 to �e' <br /> review issues for receiving our second permit on building zoning and occupancy.We will have the ,3.��a1`>�" <br /> permit application submitted by the end April. <br /> It has been a long time to get to this point but much progress has been made and granting this return <br /> for our residents will go a long way in acknowledging the work and cost that has taken place. <br /> B regards, s," <br /> r� h ,,i�� _ . � � � y� <br /> �`� .. k <br /> ,c/� � ; �,i�� � � �l��I� �-,��. <br /> James Haugen I '_: �_� ��= <br /> o;��_�01 W.,J�" I`.'., ,�•'.ri Y�^c�ax�A., <br /> 1 1-4�t1.�� a \{'yv�...x..�- <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.