, , � � <br /> Kirk Brooks <br /> From: Ding Ye <dye@reidmiddleton.com> <br /> Sent: Tuesday, September 15, 2015 3:44 PM <br /> To: Jane Zimmerman; Leif Johansen <br /> Cc: Kirk Brooks <br /> Subject: RE: 1001 N Broadway, building demo and parking lot construction <br /> Hello Jane and Kirk, <br /> We will deliver the revised drawings back to the City for final review and approval tomorrow. The design <br /> drawings were revised to incorporate Jane's review comments as described on the bottom of this string of <br /> email messages. We believe Jane's review comments have been completely addressed. <br /> The grading plan (C3.0) was revised to direct more storm runoff from the parking lot to the bioretention <br /> cells. The revised grading was sent over to Jane for a quick look before the Labor Day holiday. See message <br /> below. <br /> As suggested, extruded curbs have been added around the bioretention cells. Curb opening locations have <br /> been added to the grading drawing, and a curb opening detail has been included in the site grading drawing <br /> (C3.0). A gravel pad for each curb opening is also added (C3.0 & C4.0). <br /> Three new drawing sheets for irrigation designs (L1.2 & L1.3) and planting details (L1.4) have been added to <br /> the drawing set since last submittal. These drawings are not required for permit review but are needed for <br /> construction. Because we are using the same set of drawings for both permit approval and construction, we <br /> included these three new sheets to the drawing set. <br /> Thank you. <br /> Ding Ye, PE <br /> LEED AP, CCCA <br /> Senior Engineer <br /> Reid Middleton <br /> Engineers � Planners � Surveyors <br /> 425-741-3800 � Fax: 425-741-3900 <br /> From:Jane Zimmerman [mailto:JZimmerman@everettwa.gov] <br /> Sent:Thursday, September 03, 2015 4:12 PM <br /> To: LeifJohansen <Ijohansen@reidmiddleton.com> <br /> Cc: Ding Ye<dye@reidmiddleton.com>; Kirk Brooks<KBrooks@everettwa.gov> <br /> Subject: RE: 1001 N Broadway, building demo and parking lot construction <br /> Hi Leif— <br /> Thank you very much for your written response and for modifying your plans in accordance with my comments. I've <br /> only been able to take a quick look at the revised plans, but if you add a note regarding the required spacing and width <br /> of the curb cuts, as well as a detail that shows a profile view of a typical curb cut and the relative ground <br /> elevation/surface in the raingarden to prevent vegetation blocking the curb cut and/or erosion at the curb cut entrance <br /> 1/ <br />