Laserfiche WebLink
, 3: "I'he large size bioretention�'ells will create a similar appearance to t�existing bioretention cells north <br /> of the site. They will improve the aesthetics of the overall parking lot. <br /> We will provide cement extruded curb along the entire perimeter of the bioretention areas. Curb openings will <br /> be installed to allow runoff to enter each bioretention area. <br /> The attached sketch shows the grading revisions. Please take a look. If these revisions are acceptable to you, <br /> we will submit the revised drawings for your approval. <br /> Thanks <br /> Leif Johansen, PE <br /> Project Engineer <br /> Reid Middleton <br /> Engineers � Planners � Surveyors <br /> 425-741-3800 � Fax: 425-741-3900 <br /> From: Ding Ye <br /> Sent: Tuesday, September 01, 2015 4:01 PM <br /> To: Kirk Brooks <br /> Cc: Leif Johansen <br /> Subject: RE: 1001 N Broadway, building demo and parking lot construction <br /> Hi kirk, <br /> Thanks for forwarding Jane's comments. We will look into it. <br /> Regards. <br /> Ding Ye, PE <br /> LEED AP, CCCA <br /> Senior Engineer <br /> Reid Middleton <br /> Engineers � Planners � Surveyors <br /> 425-741-3800 � Fax: 425-741-3900 <br /> From: Kirk Brooks [mailto:KBrooks@everettwa.�ov] <br /> Sent:Tuesday, September 01, 2015 3:50 PM <br /> To: Ding Ye <dye@reidmiddleton.com> <br /> Subject: FW: 1001 N Broadway, building demo and parking lot construction <br /> Ding; here is the drainage part of the review. I'll be checking to see if there is anything else. Kirk <br /> From: Kirk Brooks <br /> Sent: Friday, August 28, 2015 2:46 PM <br /> To: Jane Zimmerman <br /> Subject: RE: 1001 N Broadway, building demo and parking lot construction <br /> �3 ��1 <br /> / <br />