My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1001 N BROADWAY EVCC PARKING 2018-12-03
>
Address Records
>
N BROADWAY
>
1001
>
EVCC PARKING
>
1001 N BROADWAY EVCC PARKING 2018-12-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2018 11:37:09 AM
Creation date
1/12/2018 1:41:51 PM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
1001
Tenant Name
EVCC PARKING
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBL1� �ORKS PERMIT • Date: 8/12/2015 <br /> Public Works Permit#: PW1508-019 <br /> City of Everett Public Works Department <br /> � 3200 Cedar Street Building Permit#; B1508-020 <br /> Everett, WA 98201 Planning Reference#: PREAPP15-02 <br /> (425) 257-8810 <br /> Public Works Fee$: � 1,000.13 <br /> Other $: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> EVERETT COMMUNITY COLLEGE REID MIDDLETON INC. <br /> 3501 COLBY AVE STE 200 <br /> EVERETT Wq 98201 <br /> PHONE: PHONE: 4257413800 <br /> TAX PARCEL ID# 29051700214500 SITE ADDRESS: 1001 N BROADWAY <br /> CONSTRUCT A NEW PARKING LOT FOR ECC <br /> A portion of the existing building will be demolished to make way for the parking lot <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4.Install any additional erosion control measures as determined by the Public Works Inspector, such as silt fence, � <br /> straw bales, swales, or erosion blankets. �..{ <br /> 5.No dirt, mud, rocks, or debris shall be tracked onto roadway. Keep streets ciean at all times. � <br /> 6. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior to starting construction and � <br /> with other inspection requests. O <br /> 7. Any temporary construction related discharge to the City's sewer system must be ap�os�d �1 �erm,tit'�by the � <br /> Everett Industrial Pretreatment Division 425-257-8240. �=� � �` � � � � <br /> 8. Site Civil Work to be done per plans approved by the City Public Works dated 0 5 � ��n1� �� � � <br /> 9. New sidewalk, street trees and tree wells are req�iired along the frontage of lot �ic�o�ciing tc�tYk�t+�Po�� y � <br /> � <br /> Mixed Use (BMU)zone standards. Lot 4 shows 111.44 feet of street frontage along North Broadway on the � <br /> Preliminary Approved Binding Site Plan map (BSP15-001).A separate Public Works perrnit and plan review will be � <br /> required for this work. Design of the sidewalk must match with lot 3 (proposed WSU building) and tQ,will align with O <br /> the existing sidewalk on lot 5. These improvements are also required as a condition of the Binding Site Plan. � <br /> Public Works Fee Breakdown: � � ��; � � <br /> Asphalt Paving $142.00 �„ �� <br /> Erosion Control $200.00 ' � ������� �� <br /> PW Plan Review$219.38 ACKNOWLEDGEMENT OF CONDITIONS <br /> PW Site Inspection $438.75 The undersigned owner/applicant hereby agrees to hold and <br /> save harmless the City of Everett from any and all claims for <br /> damages, costs, expenses, or causes of action that may arise <br /> because of installation and maintenance of the improvement <br /> � y ��- P�s- or other right-of-way use hereto applied for and further agrees <br /> to remove same upon notice from the City and to replace <br /> p v d for Constr i, �- Date public property damaged thereby. <br /> i — G � �n —� <br /> F NAL I NS TI Date / ''-�� U Z� J S <br /> Approved as Constructed Signature of Appiicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLEfION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.