Laserfiche WebLink
C: 17�� - G 3� <br /> . • � � � vZ �.�1�' ,�L ��� <br /> �" 7 � <br /> � ������ FIELD REPORT <br /> 1 of 2 <br /> �. <br /> .. .�_� �.�.�_�.s ����u����.���,�G��.�6.��.�..�.���.��..�.�,.,� �M�� M.� ��������� �� —�, <br /> � Project Name Everett River Front Simpson � Yt 039 <br /> _.... _._. _ .._.... ...... __ _.. <br /> Repo � <br /> � <br /> i GeoDesign# Polygon-127-03 : Date 05/11/2017 ° <br /> � _.._.. __...�._. _.._...._.._ _.._.. _ _.... . .__. �. _..._.______ _ _.__._... �. ... �___._.� <br /> Reports with Unresolved Nonconformance Issues: % Permrt: <br /> g � PW1505-005 � <br /> � <br /> ;w � <br /> � „ <br /> � ��� _ .����� w�,�.� ����..< ,�...4,��, ���.-�� = <br /> ��,�,,�.«��-��,� � � �� ��,� � � . <br /> ` Nick Abdelnour(Polygon) ��YaRandy Allen(City of Everett) � Weather: Cloudy/Rain, 50 S � <br /> ,: _ __ � _. _..... _._. _.._... _ .. <br /> _. . P._. ..._ _ � <br /> g Ron Bowen(Polygon) Eddy Stevens(Polygon) Afl'IVdI/De arture 1430/1500 <br /> � Distr�bution: _. _ _ _. � <br /> $ Doug Ross(Polygon) Kirk Keck(City of Everett) <br /> ; <br /> Paul McKee(City of Everett) �ave Foscer�c�ty ot Eve�ett) Prepared By. Ben Weinberg � <br /> < _ _ _ _ _ _ _. y�Q.f _ _� <br /> ; Attachments: m. Site Plan(s) m Density Test Summary Signature �-j� - , <br /> ; ❑ Instailation Records 0 Other Reviewed By <br /> . � <br /> ;�. �.,�-..� ..�.�,�a�:�...�a���� _: ..�......��. ��� .��.._...������� .�.��.F, a��..�. ___�.�,.���.���.�:�.��,.�:�:...�:.�.::,�,��,�� <br /> PURPOSE of VISIT: GeoDesign representative, Ben Weinberg, was on-site part time at the request of Craig with DDS to <br /> observe the foundation subgrade for Lots 224 and 225. <br /> SUMMARY of OBSERVATIONS: <br /> Lot 224. <br /> Previously, GeoDesign noted that DDS had over-excavated and stabilized the Lot 224 area in accordance with our <br /> recommendations. Today, GeoDesign noted that DDS had backfilled the Lot 224 area with approximately 2 feet of quarry <br /> spalls (2-4 inch)and approximately 1 foot of 2 inch railroad ballast. The 2 feet of quarry spalls were placed and tamped into <br /> place using the bucket of an excavator. The 2 inch railroad ballast material was placed and spread using an excavator and <br /> compacted into a firm and unyielding mass using a smooth drum vibratory roller. <br /> it is the opinion of GeoDesign that the founcfation subgrade ac�a for Lot 224 observed today is currently suitable for support <br /> of the intended structure. <br /> Lot 225: <br /> Previously, GeoDesign noted that DDS had over-excavated and stabilized the Lot 225 area in accordance with our <br /> recommendations. Today, GeoDesign noted that DDS had backfilled the Lot 225 area with approximately 2-3 feet of 2 inch <br /> railroad ballast material. The 2-3 feet of 2 inch railroad ballast material was placed in lifts and tamped into place using the <br /> bucket of an excavator. The exposed material at the plan bottom of footing was compacted into a firm and unyielding mass <br /> using a smooth drum vibratory roller. <br /> It is the opinion of GeoDesign that the foundation subgrade area for Lot 225 observed today is currentiy suitable for support <br /> of the intended structure. <br /> The contractor was notified of our observations prior to our departure from the site_ <br /> A summary of our observations and density tests can be found in the attached Figure 1. <br /> This report presents opinions formed as a result oi our observacion of activities relating to geotechnical engineering or envvonmental service>. We rely on the contractor to comply with the plans and <br /> specifications throughout the duration of the project irrespeRive of the presence of our represencative. Gur work dces not mdude supervision or direction of the convaaor,the mntraRor's employees <br /> or agents. Our firm is not responsible for site safery.This field report is a DRAFT representauon of our field observations,testing,and preliminary recommendations.The repat can only be considered <br /> final upon review of the GeoDesign project manager,as indicated by mitials in the"Reviewed By'seRion. <br /> 10700 Meridian Avenue North,Suite 402 I Seattle,WA 98133 I 206.838.9900 <br /> 2502 Jefferson Avenue I Tacoma,WA 98402 I 253.203.0095 � <br /> � � � <br /> �_� <br />