My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9506 7TH AVE SE 2018-02-23
>
Address Records
>
7TH AVE SE
>
9506
>
9506 7TH AVE SE 2018-02-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2018 8:40:33 AM
Creation date
1/16/2018 9:13:02 AM
Metadata
Fields
Template:
Address Document
Street Name
7TH AVE SE
Street Number
9506
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS DEPARTMENT � � � O � � � �� <br /> � Utilities Division,3200 Cedar Street � D <br /> � Everett WA 98201 � O <br /> 0 <br /> � <br /> � <br /> 425-257-8800 <br /> � �. <br /> Receipt # Date Paid <br /> Cost of Work Order Work Order# <br /> X Cost of Service Order $4377.00 Service Order# <br /> Contact Person Abraham Lee Telephone# 206 745-2434 <br /> Requested By Kirk Brooks Date of Request 1-9-2017 <br /> Property Owner(name) Solomon International School <br /> Charge Cost to(name if different than owner) Attll: Abraham Lee <br /> Address 8021 230th Ave W City Edmonds, WA Zip 98026 <br /> Installation Location 9506 7th Ave SE ,��r ,� <br /> Installation type/description/size/etc. 4" tap on,6'"water main and connect to 4" D.I. pipe <br /> contractor to excavate, shore and restore. �"/L� � <br /> ❑ The following estisnate is based upon the Utilities Division providing all labor,equipment, <br /> materials,restoration,and final hook-up. <br /> Please notify the City of Everett Utilities Division 10 working days in advance of required installation <br /> date to allow for scheduling and�arts procurement <br /> Whenever the estimated cost is not sufficient to cover the total expense for labor,material,equipment rental and <br /> adininistrative costs, the deficit shall be charged to the property for which such installation was made and the <br /> owner thereof, and provided further, that any excess payment shall be returned to the person applying for the <br /> installation. <br /> �Deposit rnust be paid prior to ordering parts or scheduling work. <br /> �Must have valid Public Works Permit before work can be performed. <br /> WATER METERS 3"AND LARGER MAY HAVE A SIX TO 10 WEEK LEAD TIME. <br /> Material $1405.00 cc: Bldg.Permit Center <br /> Mark Sadler <br /> Labor and Benefits $1983.00 Matt Welborn <br /> Equipment Rental $780.00 IZandy Allen <br /> Paul McKee <br /> Tax $209.00 Jim Spooner <br /> Kirk Srooks <br /> Restoration - Sabrina Fandler <br /> TOTAL $4377.00 Benyam Stephanos <br /> Prepared by: Jim S ner' , Date Estimate Prepared 1/12/2017 <br /> Accepted by: Representing <br /> ` ES'TIMAT�GOOD FOR 6 MONTHS ���� T �+� � ����� <br /> �_____._ <br /> � b���..��at�, `z- 3 ���> �. <br /> S:\#Common\clerical\Cost.est\2015\9506 7"'Ave CEFP.doc r ��,„�✓ <br /> a�'� —�_ <br /> R�C�� 2 :, ioEi <br /> <»,�-�"�_ ?�(�%� S�� Z n ,;.- <br /> r �.�,�: � . r ►,� ;��. .c �� �. � <br />
The URL can be used to link to this page
Your browser does not support the video tag.