My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3429 15TH ST 2018-02-23
>
Address Records
>
15TH ST
>
3429
>
3429 15TH ST 2018-02-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2018 8:44:55 AM
Creation date
1/16/2018 10:31:18 AM
Metadata
Fields
Template:
Address Document
Street Name
15TH ST
Street Number
3429
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ Introduction / Proiect Overview <br /> Burlington Northern Santa Fe (BNSF) is planning to add a new office buildirig in their <br /> Everett Yard. The project is located at the northeast corner of the intersection of 15th <br /> Street and Winter Street. The project will include construction of a new office building, <br /> parking lot and associated utilities needed to support the proposed use. In �iddition to <br /> the proposed private improvements there will also be improvements made to 15th <br /> Street and Winter Street. These include building Winter Street to city stand�irds and <br /> adding a sidewalk along the east side. <br /> Private storm water improvements will include a conveyance system, pre-trE�atment <br /> vault and a detention pond. Public storm water improvements will include catch basins <br /> to intercept runoff from the road surface. Some runoff from public improvements will be <br /> directed into the private conveyance system. <br /> Portions of the project area were not directed into the pretreatment device and detention <br /> pond. To mitigate, upstream areas are being intercepted (Basin "B") and routed through <br /> � the pond. These upstream areas are equal to or greater than the untreated, undetained <br /> portions of the project site. <br /> � This report covers the design of the storm water conveyance system, pre-treatment <br /> vault and detention pond. <br /> . <br /> March 05, 2015 <br /> � Hydrology Report — BNSF Everett Y��rd Office <br /> Page 3 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.