Laserfiche WebLink
_ Introduction / Proiect Overview <br /> Burlington Northern Santa Fe (BNSF) is planning to add a new office buildirig in their <br /> Everett Yard. The project is located at the northeast corner of the intersection of 15th <br /> Street and Winter Street. The project will include construction of a new office building, <br /> parking lot and associated utilities needed to support the proposed use. In �iddition to <br /> the proposed private improvements there will also be improvements made to 15th <br /> Street and Winter Street. These include building Winter Street to city stand�irds and <br /> adding a sidewalk along the east side. <br /> Private storm water improvements will include a conveyance system, pre-trE�atment <br /> vault and a detention pond. Public storm water improvements will include catch basins <br /> to intercept runoff from the road surface. Some runoff from public improvements will be <br /> directed into the private conveyance system. <br /> Portions of the project area were not directed into the pretreatment device and detention <br /> pond. To mitigate, upstream areas are being intercepted (Basin "B") and routed through <br /> � the pond. These upstream areas are equal to or greater than the untreated, undetained <br /> portions of the project site. <br /> � This report covers the design of the storm water conveyance system, pre-treatment <br /> vault and detention pond. <br /> . <br /> March 05, 2015 <br /> � Hydrology Report — BNSF Everett Y��rd Office <br /> Page 3 of 8 <br />