Laserfiche WebLink
INSPECTION REPORT <br /> Date � I�� Permit�. � � ���� � � o <br /> �, <br /> Contractor: <br /> Owner: �(,' �� �C� <br /> � <br /> Site Address: "✓��� � � S� <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑SIab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> �ervice ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> O ER OR CONSULTATION: _ <br /> PPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> OK FOR T.C.O. ❑ CORRECTION REQUESTED ❑ <br /> OK FOR C.O. ❑ VIOLATION <br /> UNABLETO PERFORM INSPECTION: _____ <br /> ❑ CALL(425)257-8881 FOR REINSPECTION–24 hour notice required <br /> 1 <br /> - - - _--- -- <br /> Inspector: – --- -- ----- -- Date�–��—�� <br /> EIR(10/06) DAT�FiAR,INC. <br />