My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
931 BROADWAY TEUTSCH STUDENT HOUSING 2018-03-07
>
Address Records
>
BROADWAY
>
931
>
TEUTSCH STUDENT HOUSING
>
931 BROADWAY TEUTSCH STUDENT HOUSING 2018-03-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2018 10:00:50 AM
Creation date
1/17/2018 4:21:42 PM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
931
Tenant Name
TEUTSCH STUDENT HOUSING
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Report <br /> Proposed Student Housing: 931 Broadway Street, Everett, Washington <br /> December 8, 2015 <br /> Wall backfill should be properly moisture conditi�ned, placed in loose, horizontal lifts <br /> less than 8 to 12 inches in thickness, and systematically compacted to a dense and <br /> relatively unyielding condition and to at least 95 pf;rcent of the maximum dry density, as <br /> determined using test method ASTM D-1557. V�Iithin 5 feet of the wall, the backfill <br /> should be compacted with hand-operated equipment to at least 90 percent of the <br /> maximum dry density. <br /> � 4.5 PERMANENT CUT AND FILL SLOPES <br /> Based on the anticipated soil that will be exp��sed in the planned excavation, we <br /> . recominend permanent cut and fill slopes be constructed no steeper than 2H:1 V <br /> (Horizontal:Vertical). <br /> 5.0 TEMPORARY EXCAVATIONS <br /> Temporary excavations should be constructed i 1 accordance with Part N of WAC <br /> (Washington Administrative Code) 296-155. The contractor is responsible far <br /> maintaining safe excavation slopes and/or shoring. <br /> We anticipate the excavation will encounter 2 to 5 feet of fill over glacial till. Based on <br /> these conditions the building excavation can be accomplished as an open cut with a <br /> 1 H:1 V within the fill, and '/zH:l V within the glacial till. <br /> An L-shaped footing may be used to conserve spac� for temporary excavations. <br /> Temporary excavations should be evaluated in tl�e field during construction based on <br /> actual observed soil conditions. If seepage is encc�untered, excavation slope inclinations <br /> - may need to be reduced. During wet weather, the cut slopes may need to be flattened to <br /> reduce potential erosion or should be covered with plastic sheeting. <br /> If there is not sufficient room to maintain the exca��ation within the limits of the property, <br /> temporary easements may be needed to slope the e:ccavation into the adjoining properties. <br /> If easements cannot be obtained, then temporary shoring may be needed. <br /> I 5-275 931 Broadway,Evcrctt Page �� PariC�iEO, �11C. <br />
The URL can be used to link to this page
Your browser does not support the video tag.