Laserfiche WebLink
INSPECTION REPORT <br /> Date � Permit: �i I �p�� '�� �O <br /> Contractor: '�_ <br /> Owner: �� � Y�d� �( � <br /> Site Address: � � r V _ ��� <br /> CTION REQUESTED <br /> ELECTRICAL B ILDING MECHANICAL P MBING <br /> ❑ FER ground ❑Groundwork/Slab ❑Groundwork/Slab <br />� 0 Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED ❑ <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: __ <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> �� � � ��� � <br /> �� y� � <br /> Inspector: /t" l Date:� � I� <br /> ��noioE�i _ _ � _ _ — <br /> onrn�nit,iNc <br />