My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
915 N BROADWAY WSU 2018-11-21
>
Address Records
>
N BROADWAY
>
915
>
WSU
>
915 N BROADWAY WSU 2018-11-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2018 3:44:59 PM
Creation date
1/18/2018 8:00:28 AM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
915
Tenant Name
WSU
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
857
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9/29/201� City of Everett �'"�e 1 <br /> 3:26:44PM <br /> INSPECTION ACTIVITY R�PORT <br /> Permit No. K]605-013 Site Address 915 N BROADWAY <br /> Applied 5/9/2016 Applicant Lot <br /> Approved 5/19/2016 Owner WASH[NGTON STATH UNIVEKSITY Block <br /> Issued 5/23/2016 Contractor MCKINSTRY CO LLC Tract <br /> PArent Pcrmit No. B]504-007 Description SPKINKLERS POR NLW IiDUCATION BL.DG-WSi i <br /> Notes LANDSCAPE INSPL:C'I'ION REQUIRED PRIOR"I'O�INAL.CON"I�ACT TGRF.SA WELDON(cr� <br /> 425-257-8731.PARKING MUS'I'MEF.T CI'1'Y S'I'ANDARDS PRIOR'f0 C OF O.REVI15-001; <br /> BSPI 5-001;SGPA I 5-005; <br /> Reyuested Scheduled Result <br /> Time/I3y Completed Inspection Type Inspector Remarks Notes <br /> 9/1/2016 9/1/201( Pin�l I=ire JDM Partialnpproval (09/OU201G 3:45 PM MLM) <br /> 15:42 MI,M 9/1/2016 OK to covr west end 2nd Il&8-line elev Pass: Level 2 All standpipe;fcic;pump test <br /> header;pre-action ivl 2;bascmenl piping. <br /> 10/10/2016 9/20/2016 Pinal Fire J,IV PartitilApproval <br /> 14:29 MLM 9/20/2016 I lydro I,vl 2&3 eastsidc hard lid <br /> 10/10/2016 9/29/201G Pinal Fire JDM PartialApproval <br /> 142G MI,M 9/29/2016 LI pass hydro <br /> 10/10/201G 9/29/2016 Final Fire JDM PartialApproval <br /> 1422 MLM 9/29/2016 OK to covr L3 Bathroom corridor <br /> 10/24/2016 10/24/2016 Final Fire JDM PartialApproval <br /> 16:49 MLM 10/24/2016 OK to cvr hard lid Ivl 4 west <br /> 1 I/9/2016 11/8/2016 Final Fire CHA PartialApproval <br /> 16:55 MLM 11/8/2016 OK to covr Ivl 4 eastside hard lids <br /> 11/30/2016 11/30/2016 Final Fire JDM PartialApprova( (11/3012016 121 PM MLM) <br /> 1320 MLM I1/30/2016 see notes OK to cover <br /> Level 1 -All hard lids <br /> Level 2&3 All grid cover <br /> I/4/2017 12/28/2016 I�inal Fire ,IDM PartialApproval (OVO4/2017 I 138AM MLM) <br /> I 1:37 MLM 12/28/2016 Sce Notes Cover OK <br /> All Crip levcl 2&3 <br /> Dry heads on L4 balconies musl be open to <br /> building for frecze prevention. <br /> 2/l�/2017 2/IS/2017 Pinal Firc JI)M PartialApproval (02/I�/2017 1:30 PM MLM) <br /> 1329 MI.M 2/15/2017 Sce notes LI Tiered lecture hall <br /> All grid Icvcl 4 <br /> OI<to covcr <br /> 3/31/2017 3/30/2017 Pinal�ire JDM Partit�ll�pproval (03/31/2017 12:51 PM MLM) <br /> 12:50 MI,M 3/30/2017 Sec noles OK to cover all level one <br /> I�irepump tcst 3/7/17 l0am <br /> Knox caps also <br /> 4/7/2017 4/7/2017 Pinal Fire StAC PartialApproval (04/07/20 1 7 3:41 PM MLM) <br /> 15:41 MI.M 4/7/2017 Sre notes fire pump OK,needs alann test later at <br /> tinal. <br /> 5/8/2017 5/8/2017 Final Fire JDM Corr Reqd (OS/OS/2017 l40 PM MLM) <br /> 13:39 MLM 5/8/2017 Sce notes Label valves;zone maps,trim dry heads <br /> L-4 east and north. <br /> 8/17/2017 5/18/2017 Mark Final** JDM n��proval <br /> 09:05 KLC 5/18/2017 <br /> 8/17/2017 5/18/2017 Pinal Fire JllM Approval <br /> 09:0� KLC 5/18/2017 <br /> INSP_ UI�I'nILS �� <br />
The URL can be used to link to this page
Your browser does not support the video tag.