Laserfiche WebLink
PUBLIC �RKS PERMIT � Date: 2/12/2016 <br /> Publi orks Permit#: PW1602-022 <br /> City of Everett Public Works Department <br /> ��" %�i � <br /> 32q0 Cedar Street Parent Permit#: C1601-005 <br /> Everett, WA 98201 Planning Reference#: <br /> (425) 257-8810 <br /> Public Works Fee $: $ 65.00 <br /> Other $: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> FLIP DIGS 2 LLC GOTTLIEB WILLIAM <br /> 12307 NE 97TH ST, APT E <br /> KIRKLAND Wq 98033 <br /> PHONE: 2069373923 PHONE: 2063529248 <br /> TAX PARCEL ID# 00534800102300 SITE ADDRESS: 2315 CEDAR ST <br /> RENOVATE EXTG SFR W/AN ADDITION,PORCHS�DECK <br /> PUBLIC WORKS ASSOCIATED WITH THIS PROJECT: <br /> CONSTRUCTION STORMWATER MANAGEMENT AND PERMANENT DRAINAGE PLAN (DOWNSPOUT TO SPLASH <br /> BLOCKS) <br /> OHIO ADD BLK 001 D-00 - LOTS 23 & <br /> 24 <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works <br /> Department dated 2/22/2016. �,� w <br /> 5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-74�3 prioX �3 r,�-: ��� <br /> , <br /> to starting construction and with other inspection requests. �` ' �° ;,=' [� <br /> i.:. �� .T_� ) <br /> 6. Stormwater from new impervious surfaces shall not be discharged into a combined ' ~` �"� <br /> sewer, including a lateral line or side sewer connected to the city's combined sewer �=-� � <br /> system as per EMC Chapter 14.08.180 H. � <br /> 7. It is the applicant/owner's responsibility to ensure that stormwater runoff from new O <br /> impervious surfaces are managed on-site in a manner that does nQt adversely aff�ct � <br /> neighboring properties, including the City's R.Q.W. and improvements located therein. <br /> 8. Any temporary construction related discharge to the City's sewer system must be �"� '� <br /> approved and permitted by the Everett Industrial Pretreatment Division 425-257-824p ,} ; „„ ` O <br /> � : : <br /> 9. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto ' ` - ' �- ' <br /> roadway or alley. '' r ' ' ' ,E••� <br /> 10. Install erosion control measures per City of Everett Standards for smafl parcels and � <br /> remove upon completion of the project prior to final approval of this permit. O <br /> Public Works Permit Fee Breakdown: �:;� ����r� p"� <br /> „. � <br /> Misc. Minor Permits.......$25.00 <br /> � . .,�.� ��_�.:�_�a . <br /> PW Plan Review............$20.00 <br /> PW Site Inspection........$20.00 ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless the <br /> � City of Everett from any and all claims for damages,costs,expenses,or <br /> � � ����,_�jj�.� causes of action that may arise because of installation and maintenance of the <br /> improvement or other right-of-way use hereto applied for and further agrees to <br /> A roved for Co truction Date <br /> pp remove same upon notice from the ity and to replace public property <br /> \ -— � ��� _�� damaged thereb�_� - -- --�_� <br /> � � � <br /> FINAL INSPECTIO Date — -- ' 3�21�-` <br /> Approved as Constructe Signature of Applicant -- Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br /> �-�c <br />