Laserfiche WebLink
� . <br /> Sabrina Fandler <br /> From: William Gottlieb <wmgottlieb@planone.biz> <br /> Sent: Thursday, February 11, 2016 5:26 PM <br /> To: Sabrina Fandler <br /> Subject: RE: Plan Check NO. C1601-005 2315 Cedar St <br /> Hi Sabrina, <br /> Thanks so much for getting on this. I'll have the info you need up to you this coming week. O <br /> Bill <br /> From: Sabrina Fandler [mailto:SFandlerCa�everettwa.gov] <br /> Sent: Thursday, February li, 2016 4:34 PM <br /> To: William Gottlieb <br /> Cc: Grace Pollard <br /> Subject: RE: Plan Check NO. C1601-005 2315 Cedar St <br /> Hi Bill, <br /> I apologize for the delay, as this project was not yet routed to me for review. I have the file in my possession now and <br /> have a few questions/comments before I can complete my review: <br /> 1. Are the downspouts of the current house tight-lined to the side sewer or are they disconnected to splash <br /> blocks? <br /> 2. What is the plan for downspouts for the proposed addition? <br /> 3. The existing side sewer is routed under the proposed addition. It will need to be upgraded to meet current <br /> plumbing code. <br /> 4. The site plan you have submitted does not meet our site plan standards. The lot line is inaccurately shown and <br /> the setbacks are misrepresented due to the inaccurate lot lines. Please contact the Planning Department to <br /> discuss property line and setback requirements. Grace Pollard can be reached at 425-257-8807 or <br /> GPollard@everettwa.gov. <br /> 5. Erosion control must be addressed. Please complete the attached worksheet (top section,general information, <br /> and construction stormwater plan) are the only portions that I see being required at this time, unless the <br /> downspout conditions of the existing portion of the house is changed due to the addition. Your plans are simple <br /> enough that you should only need to use the site plan you have to address all requirements. I don't see the need <br /> to create 3 separate plans. Feel free to contact me if you have any questions on this part. <br /> A new site plan will be required prior to plan approval by both Public Works and Planning. Please submit 4 copies of the <br /> revised site plan addressing the above questions/concerns and any other comments the Planning Department may have <br /> to add regarding the site plan. Please also submit two copies of the completed (only the above mentioned sections) <br /> questionnaire when you submit your revised site plan. <br /> Thanks, <br /> Sabrina Fandler, EIT, LEED°AP BD+C <br /> City of Everett Public Works Department � Development Technician <br /> 3200 Cedar St, Everett, WA 98201 <br /> Office: 425-257-8810 <br /> Direct: 425-257-7813 <br /> Email: SFandler(a�everettwa.qov <br /> 1 <br />