My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Public Utility District No 1 of Snohomish Co 12/6/2017 Amendment
>
Contracts
>
Agreement
>
Interlocal Agreements
>
Public Utility District No 1 of Snohomish Co 12/6/2017 Amendment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 7:10:13 AM
Creation date
1/18/2018 8:52:01 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Public Utility District No 1 of Snohomish Co
Approval Date
12/6/2017
Council Approval Date
11/29/2017
Department
Public Works
Department Project Manager
Julie Sklare
Subject / Project Title
Cost Sharing Heny M Jackson Hydroelectric
Amendment/Change Order
Amendment
Total Compensation
$467,469.00
Contract Type
Agreement
Contract Subtype
Interlocal Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11.Y . ' Cost Share <br /> p "..m �Iit1 1il1i�i�I�ii LIQ (Mi h <br /> ��� � �� ���� �l� it Eligible <br /> Recreation Sites <br /> Spada Lake Recreation Including all structures, amenities, and boat ramps; <br /> Sites completed 1990 <br /> Trout Farm Rd, Powerhouse East, Powerhouse West, <br /> Sultan River Recreation Diversion Dam Rd= 100% responsibility of District; N <br /> Sites Horseshoe Bend and Old Gaging Station Rd= 100% <br /> responsibility of City; completed 2011 <br /> Penstock System <br /> Culmback Dam Intake Including intake tower, sensor and alarms; completed N <br /> System 1984 <br /> Blue Mountain Tunnel Including 3.8-mile bored tunnel (14 feet in diameter); <br /> completed 1984 <br /> Including 3.7-mile steel pipeline (10 feet in <br /> Steel Penstock diameter), surface right of way/road system, access N <br /> portals; completed 1984 <br /> Powerhouse <br /> Including powerhouse structure, equipment(other <br /> Powerhouse than electrical generation, switchyard, and piping <br /> manifold), and the fish passage berm; completed <br /> 1984 <br /> Piping Manifold Including the intake manifold, valves, discharge <br /> manifold, inside the Powerhouse; completed 1984 <br /> Generation System Including electrical generation equipment, switchyard <br /> equipment; completed 1984 <br /> Communication Including antennae, tower(s), cabling, and <br /> Systems equipment; completed 1984; updated 2016 (applies to Y <br /> communication between eligible locations only) <br /> Return Pipeline <br /> Including 3.5-mile pre-stressed and pre-tensioned <br /> concrete cylinder pipe (6-foot in diameter), steel <br /> Steel Return Pipeline manifoldp�P� g i in under Sultan River, access <br /> manholes, and appurtenances; completed 1984 <br /> Diversion System <br /> Portal 2 Completed 1984 Y <br /> Diversion Tunnel No. 1 Including Portal 1; completed 1930 Y <br /> Diversion Pipeline Completed 1930; replaced 1984 Y <br /> 2017 Amended Agreement(Henry M.Jackson Hydroelectric Project) Page A-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.