My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Public Utility District No 1 of Snohomish Co 12/6/2017 Amendment
>
Contracts
>
Agreement
>
Interlocal Agreements
>
Public Utility District No 1 of Snohomish Co 12/6/2017 Amendment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 7:10:13 AM
Creation date
1/18/2018 8:52:01 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Public Utility District No 1 of Snohomish Co
Approval Date
12/6/2017
Council Approval Date
11/29/2017
Department
Public Works
Department Project Manager
Julie Sklare
Subject / Project Title
Cost Sharing Heny M Jackson Hydroelectric
Amendment/Change Order
Amendment
Total Compensation
$467,469.00
Contract Type
Agreement
Contract Subtype
Interlocal Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix B-1 <br /> Maintenance Actions/Costs Shared <br /> Maintenance actions for which costs will be shared: <br /> 1. Clearing and removing water-borne debris from Spada Lake Reservoir, Culmback Dam, <br /> and Diversion Dam. <br /> 2. Safety boom maintenance on Spada Lake Reservoir. <br /> 3. Inspection and maintenance of Morning Glory Spillway and discharge works. <br /> 4. Elevator maintenance and safety requirements at Culmback Dam. <br /> 5. Maintenance of the valves at Culmback Dam Valve Chamber. <br /> 6. Maintenance of communication system(s) for security and dam safety of Culmback Dam <br /> and Diversion Dam (e.g. microwave systems between Powerhouse, Blue Mountain, and <br /> Culmback Dam). <br /> 7. Maintenance of piezometer system at Culmback Dam. <br /> 8. Maintenance of seismic monitoring equipment at Culmback Dam. <br /> 9. Inspections and maintenance of valve chamber access tower bridge. <br /> 10. Rental, cleaning, and maintenance of vault and/or portable toilet(s) at eligible facilities. <br /> 11. Water intrusion prevention at eligible Culmback Dam components. <br /> 12. Removing danger trees adjacent to eligible roads and recreation sites. <br /> 13. Maintenance of eligible roads. <br /> 14. Minor road slide maintenance and snow removal required on eligible roads. <br /> 15. Noxious weed control (on Project lands at Culmback Dam or above, within the Project <br /> Boundary). <br /> 16. Cleanup and maintenance of eligible Spada Lake recreation sites. <br /> 17. Cleaning, maintenance, and upgrade of the SCADA system(s) at eligible components. <br /> 18. Maintenance of Diversion system. <br /> 19. Maintenance of security systems at eligible components. <br /> 2017 Amended Agreement(Henry M.Jackson Hydroelectric Project) Page B-1 <br />