My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Public Utility District No 1 of Snohomish Co 12/6/2017 Amendment
>
Contracts
>
Agreement
>
Interlocal Agreements
>
Public Utility District No 1 of Snohomish Co 12/6/2017 Amendment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 7:10:13 AM
Creation date
1/18/2018 8:52:01 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Public Utility District No 1 of Snohomish Co
Approval Date
12/6/2017
Council Approval Date
11/29/2017
Department
Public Works
Department Project Manager
Julie Sklare
Subject / Project Title
Cost Sharing Heny M Jackson Hydroelectric
Amendment/Change Order
Amendment
Total Compensation
$467,469.00
Contract Type
Agreement
Contract Subtype
Interlocal Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. If, at any time, Time of Minimum Water Usage (defined in Article I, 1981 <br /> Amended Agreement and used in Article IV, Section 3, 1981 Amended <br /> Agreement) occurs, City shall, within one year of the actual occurrence, <br /> pay District the remaining unpaid balance of its $10 million share of Stage <br /> II. <br /> 9. City's payment for Stage II of Culmback Dam does not alter or abridge <br /> District's sole responsibility for, and operation of, the Jackson Project <br /> including Spada Lake, which is subject to the District's license issued by <br /> the Federal Energy Regulatory Commission (FERC). <br /> III. Project Action and Cost Sharing <br /> A. Definitions. The following definitions apply to Part III, Project Action and Cost <br /> Sharing: <br /> Adjusted annually for inflation: Adjusted on or after April 1 of each year, <br /> beginning April 2018, and effective January 1 of said year,based on the percent <br /> change (up or down) in the Specified Index. <br /> Administrative: An action (other than Maintenance,Insurance, Construction, <br /> or Operation) that supports the delivery of water to the Parties. Administrative <br /> actions include payment of fees (e.g. lease fees paid to the State of Washington) <br /> and execution of an ongoing program required by industry standard or regulatory <br /> action (e.g. a dam safety emergency action plan). <br /> Component: A single element of a Facility, such as an individual manufactured <br /> piece of equipment or collection of equipment within a discrete element of a <br /> Facility. <br /> Construction: Action (other than Maintenance,Administrative,Insurance, or <br /> Operation) to erect new infrastructure of a functionality that did not previously <br /> exist, or to replace an existing Facility, Component, or portion thereof due to <br /> Level of Service failure when such replacement costs $50,000 or more (in 2017 <br /> dollars, adjusted annually for inflation) and is less expensive than repair, and <br /> which has Value to both City and District. <br /> Facility: A single element of the Project, having a specific independent <br /> functionality, as distinguished from other elements. <br /> Insurance: Costs to insure Stage I, Stage II, and Recreation Sites. <br /> Level of Service: Criteria for performance requirements set for a Facility or <br /> Component. The decision to repair or replace a Facility or portion thereof partly <br /> rests on whether it has failed one or more level of service criteria (e.g. the demand <br /> on a facility may exceed its capacity, the facility may no longer meet <br /> 2017 Amended Agreement(Henry M.Jackson Hydroelectric Project) Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.