My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 1337-87
>
Ordinances
>
Ordinance 1337-87
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2018 9:41:19 AM
Creation date
1/18/2018 9:41:18 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
1337-87
Date
2/25/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> 5. Allocate $15, 334. 58 to restore outside facades of <br /> historic structures such as the Lowell Church or Fire Hall . <br /> Money will be repaid for restoration of other Lowell <br /> buildings. <br /> 6. Allocate $2 , 854. 90 to Council for a Greater Everett for <br /> community organizing and work on neighborhood issues . <br /> 7. Allocate $13 , 857. 22 to street and sidewalk improvements <br /> on the West side of 3rd Avenue . <br /> B . Northeast Everett Neighborhood Improvements <br /> 1. 1100 Block of Maple - curb, gutters , sidewalks , drainage , <br /> and street overlay (estimated project costs : $50, 000.00) . <br /> 2. Southern most 200 feet of 1800 block of Chestnut adjacent <br /> to 19th - paved and curbs on both sides and sidewalk on west <br /> side (estimated project cost : $25, 000.00) . <br /> 3. Engineering and design of neighborhood improvement <br /> projects. <br /> C. Port Gardner Neighborhood Improvements <br /> 1 . Install eight wheelchair ramps at Pacific and Norton <br /> Avenue intersection. Estimated cost : $1 , 600. 00. <br /> 2. Install eight wheelchair ramps at Wetmore and 32nd Street <br /> intersection. Estimated cost : $1 , 600. 00. <br /> 3 . Allocate $3,000.00 to Council for a Greater Everett for <br /> community organizing and work on neighborhood issues . <br /> 4. Allocate $5, 000.00 for attic insulation and <br /> weatherstripping in low income homeowners ' residences. <br /> 5 . Complete inventory of historic properties in Port <br /> Gardner. Estimated cost $5 , 000. 00. <br /> 6. Plant trees in publicly-owned areas throughout the <br /> neighborhood. Estimated cost : $2 , 500. 00. <br /> 7. Construct new curb , gutter, land sidewalk on both sides <br /> of 4000 block of Friday , widen roadway to 28 feet to allowing <br /> parking on one side of block. Estimated cost : $54, 000.00. <br /> 8. Construct health path, possibly from Doyles Park to <br /> Jackson Playfield . Estimated cost : $12 ,000.00. <br /> 9. Neighborhood traffic study . (only if study is not done by <br /> City of Everett Transportation Department) . <br /> 10. Engineering and design of neighborhood improvement <br /> projects. <br />
The URL can be used to link to this page
Your browser does not support the video tag.