My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 1336-87
>
Ordinances
>
Ordinance 1336-87
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2018 9:42:46 AM
Creation date
1/18/2018 9:42:45 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
1336-87
Date
2/25/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Install concrete curb and gutter and off-street parking <br /> on 24th Street from Walnut to state Street as outlined in <br /> the Garfield Park Master Plan (estimated project cost : <br /> $27, 800) . <br /> 3. Replace broken sidewalk as needed on the east side of <br /> Walnut from 20th to 22nd Street (estimated project cost : <br /> $5, 000) . <br /> 4. Replace approximately 165 feet of sidewalk and <br /> construct a drainage system to intercept ground water flow <br /> on the west side of Maple from 19th Street to Victor Place <br /> (estimated project cost : $4,700) . <br /> 5. Allocate funds to the Council for a Greater Everett to <br /> provide support services to the Riverside Neighborhood <br /> ( funds to be allocated : $1 , 000) . <br /> 6. Replace sidewalk segment in front of 2401 and 2405 <br /> Virginia (estimated project cost : $1 , 100) . <br /> 7. Replace sidewalk segment in front of 2414 Baker <br /> (estimated project cost : $550) . <br /> 8. Replace sidewalk segment in front of 2524 Maple <br /> (estimated project cost : $900) . <br /> D . Port Gardner Neighborhood Improvements <br /> 1. $1 ,000 to Council for Greater Everett for neighborhood <br /> fair share assistance for support services to Port Gardner <br /> neighborhood. <br /> 2. Terrace Drive (43rd Street to 44th Street) , concrete <br /> curb and gutter on both sides , install storm drainage <br /> system, landscaping behind curb, asphalt resurfacing <br /> (estimated project cost : $42, 500) . <br /> 3. 43rd Street ( alley west of Rucker Avenue to Grand <br /> Avenue) construct concrete curb and gutter on north side of <br /> 43rd, install storm drainage system ( estimated project <br /> cost : $14, 160) . <br /> 4. $500 to Jackson Elementary School PTA towards estimated <br /> $2, 400 playground equipment to be purchased by PTA. <br /> 5. Terrace Drive (42nd Street to 41st Street) , concrete <br /> curb and gutter on west side , install storm drainage <br /> system, asphalt resurfacing ( estimated project cost : <br /> $34 , 150) . <br /> 6. 35th Street at Hoyt intersection, install flashing <br /> signal light for traffic control and pedestrian safety <br /> (estimated project cost : $8, 140) . <br />
The URL can be used to link to this page
Your browser does not support the video tag.