My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
208 LAMAR DR MUKILTEO WATER AND WASTEWATER DISTRICT 2018-11-08
>
Address Records
>
LAMAR DR
>
208
>
MUKILTEO WATER AND WASTEWATER DISTRICT
>
208 LAMAR DR MUKILTEO WATER AND WASTEWATER DISTRICT 2018-11-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2018 8:58:40 AM
Creation date
1/19/2018 10:25:49 AM
Metadata
Fields
Template:
Address Document
Street Name
LAMAR DR
Street Number
208
Tenant Name
MUKILTEO WATER AND WASTEWATER DISTRICT
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLI�ORKS PERMIT • Date: 1/24/2017 <br /> Public Works Permit#: PW1701-021 <br /> City of Everett Public Works Department <br /> 3200 Cedar Street Parent Permit#: <br /> ��� Everett, WA 98201 <br /> Planning Reference#: <br /> (425) 257-8810 <br /> Public Works Fee$: $ 45.00 <br /> Other $: <br /> OWNER NAME AND ADDRESS: PPLICANT NAME AND ADDRESS: <br /> MUKILTEO WATER AND WASTEWATER DISTRICT MUKILTEO WATER AND WASTEWATER DISTRICT <br /> 7824 MUKILTEO SPEEDWAY 7824 MUKILTEO SPEEDWAY <br /> MUKILTEO Wq 98275 MUKILTEO WA 98275 <br /> PHONE: 4253553355 PHONE: 4253553355 <br /> TAX PARCEL ID# 00433600006301 SITE ADDRESS: 208 LAMAR DR <br /> REPLACE WATER MAIN AND RESTORE ROAD <br /> PERMIT FOR PORTION OF WORK LOCATED IN CITY OF EVERETT LIMITS. ROAD TO BE RESTORED TO WSDOT <br /> STANDARDS AND WATER LINE INSTALLATION PER MUKILTEO WATER &WASTEWATER DISTRICT STANDARDS. <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 �;j .�,a:;,;; <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works `'�' ' '-'' <br /> ;......��...... --= a <br /> � ��� <br /> Department dated 1/24/2017. ��r��, --i " <br /> 5. Contact the City of Everett Public Works InspectorJim Knappert at 425-339-7404 ��; ,_...,;-,, ;=' w <br /> prior to starting construction and with other inspection requests. : : �.�:s'�''_ '-;; [�I <br /> 6. Install erosion control measures and remove upon completion of the project prior to '<�; M"'� <br /> i".J -�i.t r_� r^ <br /> final approval of the permit. �--• ����- �� <br /> �,, <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto �-"-=�"- � <br /> roadway. �: ; <br /> 8. Protect existing underground utilities during construction. '�''' ' � � <br /> 9. Coordinate with adjoining businesses/homeowners to minimize obstruction of r� ='- � <br /> commerce/access. ��::�a �;;� ` Z <br /> i, 'c e �aTi I <br /> e y.a' <br /> Public Works Permit Fee Breakdown: °V'�'�'`_' :-�,�_��" � � <br /> ---i�.a=�t,". <br /> Misc. Minor Permits& Plan Review...........$25.00 �-'� � <br /> ...� <br /> PW Site Inspection....................................$20.00 '�"��� <br /> � <br /> 0 <br /> � <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless the <br /> City of Everett from any and all claims for damages,costs,expenses,or <br /> ���� causes of action that may arise because of installation and maintenance of the <br /> Approved for Construction Dat improvement or other right-of-way use hereto applied for and further agrees to <br /> remove same upon notice from the City and to replace public property <br /> damaged thereby. <br /> FINAL INSPECTION Date � ���/7 <br /> Approved as Constructed Signature of Applicant ' Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON TH�OJECT OVER 90 DAYS DURATION. <br /> F,�� � ( � � <br />
The URL can be used to link to this page
Your browser does not support the video tag.