My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3317 30TH DR 2018-01-19
>
Address Records
>
30TH DR
>
3317
>
3317 30TH DR 2018-01-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2018 4:01:32 PM
Creation date
1/19/2018 4:01:21 PM
Metadata
Fields
Template:
Address Document
Street Name
30TH DR
Street Number
3317
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kirk Brooks <br /> � � <br /> From: Michael Brick <br /> Sen�t: Friday, April 29, 2016 1229 PM <br /> To: Kirk Brooks <br /> Subject: Polygon Riverfront (Eclipse and Simpson Sites)Traffic Mitigation Fees <br /> Kirk, <br /> I located the Traffic Impact Analysis by Transportation Engineering NorthWest for this project dated 6/16/2014. Based <br /> on their study I have figured out the per-unit and proportionate share fees for these projects. Here is a breakdown to <br /> the traffic mitigation fees due for the Polygon Riverfront projects: <br /> Date of Eclipse Site �p�y�� Simpson Site <br /> Payment per-Unit System Wide Proportionate Share Per-Unit System Wide Fee Proportionate Share <br /> Fee of Off-site of Off-site <br /> Improvements Improvements <br /> Before $351 per Unit $4,875 due with final <br /> $854 per Unit $14,300 due with final <br /> 6/2/2017 "per unit" fee "per unit" fee payment <br /> payment <br /> On or after (0.39 trips x fee pertrip $4,875 due with final (0.95 trips x fee per�rip in $14,300 due with final <br /> 6/2/2017 in effect at payment) per "per unit"fee effect at payment) per "per unit"fee payment <br /> Unit naymenfi lJnit <br /> _ __ _ _ _ _ . _- _ — - _ __ __ _ ____ _ _ __ _ _ _ _ � <br /> The proportionate share payment for signal improvements should be collected when the traffic mitigation fee for the <br /> last unit in each development are �aid. These fees are not tied to inflation and will not change if they are paid afterJune <br /> 2, 2017 when the per-unit fee increases. <br /> If you have any further questions please let me know, <br /> Michael Bri�k, P.E. <br /> Associate Traffic Engineer <br /> City of Everett Public Works <br /> (425)257-7790 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.