Laserfiche WebLink
�;:.. <br /> INSPECTION REPORT <br /> N �� Date J � � � Permit: �� 1 �� I r� � � <br /> �� I <br /> Contractor: �! �j� <br /> '� Owner: �� 1 �G� �� � � <br /> Site Address: �3 �� ���✓ l�' ' ���� <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid �Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough in/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> �PROVAL ❑ RTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> OK FOR T.C.O. ORRECTION REQUESTED ❑ <br /> ❑ OK FOR C.O. IOLATION <br /> ❑ UNABLE TO PERF INSPECTION: _ <br /> ❑ CALL(425)257-8881 FOR REINSPECTION–24 hour notice required <br /> � �' a � 9�r� <br /> � <br /> � � � � <br /> Inspector: Date: — �� <br /> EIR(10/06) DA ABAR,INC. <br />