Laserfiche WebLink
• i► �� �� I�� <br /> PUBLIC WORKS PERMIT Date: 3 0�6 <br /> Public Works Permit#: PW1603-013 <br /> City of Everett Public Works Department <br /> °� �L� <br /> 3200 Cedar Street Parent Permit#: C1602-020 <br /> Everett, WA 98201 Planning Reference#: SUB14-006 <br /> (425) 257-8810 <br /> Public Works Fee $: $ 416.00 <br /> Other $: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> POLYGON WLH LLC PNW Riverfront LLC <br /> 11624 SE 5TH ST 11624 SE 5th Street#200 <br /> BELLEVUE �/�/q 98005 BELLEVUE WA 98005 <br /> PHONE: PHONE: 4255867700 <br /> TAX PARCEL ID# SITE ADDRESS: 3511 31 ST DR Lot 134 <br /> NEW TOWNHOME/TRAFFIC MITIGATION <br /> The Towns at Riverfront <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior <br /> to starting construction and with other inspection requests. w <br /> 5. Install any erosion control measures as determined by the Public Works Inspector, E--I <br /> such as silt fence, straw bales, swales, or erosion blankets. � <br /> 6. Connect side sewer per City Standard #'s 601 through 604. <br /> 7. Connect rooftop downspouts to the drainage system provided for this lot. � <br /> 8. Driveway to Garage shail be paved. O <br /> 9. The City will not issue a Building final or Certificate of Occupancy until the new � <br /> sidewalk is installed along this property's frontage. <br /> 10. This building's foundation will require structural fill trenches per the Geotech report. �� � � Z <br /> Adherence to the GeoDesign geotechnical report will be required for this construction. � O <br /> Public Works Permit Fee Breakdown: E,.,� <br /> PW Plan Review..............$20.00 OCj � � ZQir � <br /> PW Site Inspection..........$20.00 O <br /> Driveway..........................$25.00 CITY OF �VERETT � <br /> Traffic Mitigation............$351.00 Permit Services <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless the <br /> /� City of Everett from any and all claims for damages, costs,expenses,or <br /> � �.� � � ,��� causes of action that may arise because of installation and maintenance of the <br /> A roved for Construction Date improvement or other right-of-way use hereto applied for and further agrees to <br /> p remove same upon notice from the City and to replace public property <br /> damaged thereby. <br /> FINAL INSPECTION Date �� �O/�,3/�b <br /> Approved as Constructed Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />