My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Snohomish County 11/16/2017
>
Contracts
>
Agreement
>
Snohomish County 11/16/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2018 9:48:37 AM
Creation date
2/1/2018 9:48:23 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Snohomish County
Approval Date
11/16/2017
Council Approval Date
11/8/2017
Department
Planning
Department Project Manager
Allan Giffen
Subject / Project Title
Development Agreement Amendment
Tracking Number
0001048
Total Compensation
$0.00
Contract Type
Agreement
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
will be provided through the north side addition and a south side exterior shear wall.The two existing <br /> public elevators internal to the courthouse will be replaced with a single secured elevator for staff access. <br /> The current inmate-circulation elevator internal to the existing courthouse will remain in service but court <br /> facilities on the east end of the courthouse will be reconfigured to allow for secure inmate transfer <br /> between the elevator corridor and adjacent courtrooms.Other renovation will involve enlarging existing <br /> courtrooms, restrooms and public access corridors to provide accessibility for disabled individuals; <br /> relocation of the Law Library to the basement, and relocation and consolidation of district court and <br /> Sheriff's Office Administration as set forth above. <br /> Summary: The Project will substantially prolong the useful life and functioning of the existing Courthouse <br /> by providing modern security screening, public circulation and access corridors serving the existing <br /> Courthouse and allowing for reconfiguration of space internal to the structure consistent with modern <br /> security protocols for courthouses and compliance with public accessibility requirements. (Internal <br /> spaces to be renovated currently do not have room to accommodate the separate public, staff,and <br /> security circulation and access which are consistent with modern courthouse security protocols. This <br /> project will create that room in portions of the building.) Occupancy and utilization of the existing <br /> Courthouse following completion of the Project will remain unchanged and it will continue to provide the <br /> same public services currently contained therein consisting of the following:Superior Court and District <br /> Court(including Judiciary, Commissioners and administration); Sheriff's Office (including licensing and <br /> registration, investigations and administration); and County Clerk. <br /> While the new addition will provide for one additional Superior Court Courtroom,that courtroom will <br /> serve an existing judicial seat which is currently based at the courthouse and,thus, will not result in any <br /> increased staffing or FTE's on campus. Accordingly,while the 2017 Traffic Impact Analysis accompanying <br /> the SEPA submittal projects the potential for 7 additional afternoon trips for which there is sufficient <br /> Campus Garage capacity,the Project is not anticipated to generate any increased occupancy associated <br /> with the Courthouse. It is further noted that cumulative FTE staffing levels on the County Campus as a <br /> whole have never reached the 1,908 FTE projections utilized by the City in the existing 2002 Development <br /> Agreement upon which the current parking requirements are based; current FTE staffing level on Campus <br /> is approximately 1,615 FTEs. Lastly, a Supplemental Transportation Impact Analysis completed in <br /> December 2014 relating to the former courthouse replacement project demonstrated that there remains <br /> excess parking capacity within the existing county garage and that the proposed courthouse project will <br /> not generate any additional employees,visitors or jurors beyond the projections in the 2002 <br /> Development Agreement. <br /> Page 8-of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.