Laserfiche WebLink
G <br /> Prepa redness Planning <br /> WORK PLANNED. WHY THE WORK IS BEING DONE RESULT OF THE WORK <br /> 1 -Exercise and train Parks staff with Disaster During the last full activation exercise of the city's The Disaster Mobile Shelter be constantly ready to <br /> Mobile Shelter operations. Disaster Mobile Shelter,a few components of the deploy at a moment's notice. <br /> -Inventory and assess components,supplies,and soft-sided shelter tents were found to be <br /> equipment. deteriorating. Every few years,OEM also <br /> -Replace or repair any necessary items,to include inventories the shelf-stable food and water <br /> additional shelter tent(s),sanitation and hygiene supplies which are stored in the Disaster Mobile <br /> items,additional types of shelf-stable emergency Shelter trailers. <br /> food and water supplies. <br /> 2 Train and exercise non-city structural engineers to After a major earthquake,buildings in Everett will Having an identified,trained,and credentialed <br /> function on behalf of the City in regards to post- have varying degrees of damage.Without a group of engineers to evaluate buildings for the <br /> earthquake building damage to a degree above proper evaluation,it would be hard to determine City will help the Building Department to assess <br /> ATC-20(the Structural Engineers Association of whether or not a building was safe for reentry. more buildings in less time.This allows people to <br /> Washington's Post-Earthquake Evaluation of Everett's Building Department is small and,on its reenter buildings sooner in response and recovery <br /> Buildings). own,it would take a significant amount of time to efforts and marks unsafe buildings sooner to <br /> evaluate even just the most critical buildings. prevent potential injury. <br /> DHS-FEMA-EMPG-FY 17 PagE823 of 36 City of Everett, E18-069 REVISED <br />