rte/ <br /> � I <br /> EVERE I I STATION PARK-AND-RIDE EXPANSION <br /> Agreement with Perteet Inc. • January 2018 <br /> 10.2 Conformed Construction Documents <br /> If addendums are issued during the bidding process,the Consultant will prepare conformed construction <br /> documents that incorporate the changes made by addendum during the bidding process. <br /> Deliverables: <br /> • If addendums are issued,the consultant will provide one(1)hard copy and one(1)electronic copy in PDF <br /> format of conformed contract plans and specifications,as appropriate. <br /> Items to be furnished by Everett Transit <br /> • Property boundary line description for the park-and-ride site. <br /> • Everett Transit logo for use on plans. <br /> • Consolidated plan review comments at each submittal. <br /> • Specification boilerplates and front end documents. <br /> Optional Services <br /> • Public Outreach or Public Meetings <br /> • Traffic Analysis <br /> • WSDOT Permitting and Coordination <br /> • Construction Administration <br /> • Greenroads Documentation <br /> • Infiltration Pit Testing <br /> Time for Completion <br /> The following milestone dates are anticipated for the project: <br /> • NTP by 2/15/2018 •• <br /> • Conceptual.Design by 4/10/2018 <br /> • 60%Design by 8/10/2018 <br /> • 100%Design by 10/31/2018 <br /> • IFB Bid Ready Set by 12/31/2018 <br /> Milestone deadlines are subject to change if Everett Transit or other review cycles are significantly lengthier than <br /> anticipated. <br /> • <br /> 19 <br /> File location:X:\Everett,City of\Promo Efforts\20170146-Everett Station P&R Expansion\Promo\Business Development\Scope\Everett Transit Parking <br /> Lat_Scope2018-1-10.docx 101 <br />