Laserfiche WebLink
Exhibit "B" <br /> 17 <br /> Consultant Fee Determination Summary PERTEET <br /> 2707 Colby Avenue,Suite 900,Everett,WA 98201 1 P 425.252.7700 <br /> Project:Everett Station P&R Expansion <br /> Client:City of Everett Transportation Services <br /> Hourly Costs <br /> Classification Hours Rate • Amount <br /> Sr.Associate 6 $200.00 $1,200 <br /> Sr.Associate 38 $200.00 $7,600 <br /> Sr.Associate 108 $200.00 $21,600 <br /> Sr.Engineer/Mgr 24 $180.00 $4,320 <br /> Sr.Engineer/Mgr 189 $180.00 $34,020 <br /> Sr.Engineer/Mgr 56 $180.00 $10,080 <br /> Lead Engineer/Mgr 48 $160.00 $7,680 <br /> Engineer III 132 $130.00 $17,160 <br /> Engineer II . 428 $120.00 $51,360 <br /> Engineer I • 56 $100.00 $5,600 <br /> Lead Technician/Designer 390 $120.00 $46,800 <br /> Planner II 110 $110.00 $12,100 <br /> Accountant 16 $90.00 $1,440 <br /> Clerical 36 $80.00 $2,880 <br /> Total Hourly Costs 1,637 $223,840.00 <br /> Reimbursables <br /> Expenses Amount <br /> $ <br /> Total Expenses 0 <br /> In-House Costs Q Rate Amount <br /> $ $ <br /> Total In-House Costs 0 <br /> Subconsultants <br /> Subconsultants Cost Markup Amount <br /> 1 Alliance Geomatics,LLC $6,920.00 1.00 $6,920 <br /> HWA GeoSciences Inc $19,132.00 1.00 $19,132 <br /> Total Subconsultant Costs $26,052.00 $26,052.00 <br /> Other <br /> Management Reserve $0 <br /> Total Other Costs $ 0.00 <br /> Contract Total $249,892.00 <br /> Prepared By: Darrell C.Smith Date: January 10,2018 <br /> 110 <br />