My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018/01/24 Council Agenda Packet
>
Council Agenda Packets
>
2018
>
2018/01/24 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2018 10:31:52 AM
Creation date
2/7/2018 10:31:18 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/24/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> Run Date: 7/10/2017 City of Everett-Public Works Department Cutoff Date: 6/30/2017 <br /> Time: 8:43 AM Contract Estimate Voucher <br /> Project: 346 For Work Order#2600G Contractor: AMERICAN PROCESS GROUP INC <br /> 2017 BIOSOLIDS REMOVAL Estimate#3 946 BOULDER BLVD <br /> WO 26000 BID:$638,120.65 STONY PLAIN,AB,CANADA T7Z 0E6 <br /> TOTAL BID:$638,120.65 <br /> Unit Plan Total Previous Present Total Previous Present <br /> Item II Description Units Price Quantity Quantity Quantity Quantity Amount Amount • Amount <br /> 0001 Mobilization and Demobilization LS 128,558.00 1.00 1.0000 1.0000 0.0000 128,558:00 128,558.00 0.00 <br /> 0002 Dredging Aeration Cell2 DRY T 73.49 2,000.00 2,144.5000 2,000.0000 144.5000 157,599.31 146,980.00 10,619.31 <br /> 0003 Dewatering Aeration Cell 2 DRY T 164.12 2,000.00 2,144,5000 2,000.0000 144.5000 351,955.34 328,240.00 23,715.34 <br /> Work Order Totals: 638,112.65 603,778.00 34,334.65 <br /> • <br /> • • <br /> • <br /> • <br /> • <br /> • <br /> M <br />
The URL can be used to link to this page
Your browser does not support the video tag.