My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018/01/24 Council Agenda Packet
>
Council Agenda Packets
>
2018
>
2018/01/24 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2018 10:31:52 AM
Creation date
2/7/2018 10:31:18 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/24/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 15 <br /> PROJECT TITLE: <br /> Award the Legion Golf Course Briefing COUNCIL BILL# <br /> Stormwater Detention Project, Proposed Action Originating Department Public Works <br /> to Rodarte Construction Inc Consent Contact Person Souheil Nasr <br /> Action Phone Number 425-257-7210 <br /> First Reading FOR AGENDA OF January 24, 2018 <br /> Second Reading <br /> Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> Administration <br /> Council President /40X <br /> Location Preceding Action Attachments Department(s)Approval <br /> Northwest Everett Call for Bids, Bid Total Summary Parks and Public Works <br /> November 15,2017 <br /> Amount Budgeted $4,000,000.00 <br /> Expenditure Required $3,760,658.25 Account Number(s): UP 3620 <br /> Budget Remaining $237,341.75 <br /> Additional Required $0 <br /> DETAILED SUMMARY STATEMENT: <br /> The goal of this project is to eliminate basement flooding of homes in the vicinity of Alverson, Grand, <br /> Rucker,Hoyt, Colby and Wetmore between 4th and 10th Streets and eliminate sewer backup and surface <br /> flooding at Rainier Hall at Everett Community College. <br /> The work will also enhance the strategy,playability and character of the golf course while also improving <br /> player safety,pace-of-play and reducing ball trespass potential. <br /> Construction bids were received from 14 contractors on January 9,2018, and a summary tabulation of bid <br /> totals is attached. The lowest responsive and responsible bid is $ 3,760,658.25 from Rodarte Construction <br /> Inc. of Auburn,WA. The Lowest Bid is 11%above engineer's estimate. Construction is anticipated to begin <br /> in March and be completed by October 2018. <br /> RECOMMENDATION(Exact action requested of Council): <br /> Award the Legion Golf Course Stormwater Detention Project to Rodarte Construction Inc. in the amount of <br /> $3,760,658.25. <br /> 63 <br />
The URL can be used to link to this page
Your browser does not support the video tag.