My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018/01/24 Council Agenda Packet
>
Council Agenda Packets
>
2018
>
2018/01/24 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2018 10:31:52 AM
Creation date
2/7/2018 10:31:18 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
1/24/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 7, <br /> EVERETT STATION PARK-AND-RIDE EXPANSION <br /> Agreement with Perteet Inc. - January 2018 <br /> • Site Assessment Maps in 11"x17"sheet size with a scale of 1:50,to be included in the Drainage Report. <br /> • <br /> 4.3 Offsite Analysis • <br /> The Consultant will conduct a downstream analysis extending%4 mile downstream/down-gradient of the project <br /> limits for each of the Threshold Discharge Areas(TDAs)identified.The downstream analysis will include a review <br /> of recent drainage complaint documentation provided by the City(if it exists)and a visual assessment of <br /> downstream routes to identify evidence of erosion,flooding,sedimentation,or flow constriction points.A visual <br /> above-ground inspection,where practical,will be conducted for each of the downstream drainage conveyance <br /> systems associated with the project.Representative photographs will be taken and an assessment of the <br /> downstream effects will be performed.The assessment of the downstream effects is to be a qualitative evaluation <br /> based upon engineering judgment.The Consultant will prepare a written description of the downstream system <br /> conditions and provide a map showing downstream routes.This task does not include detailed hydraulic analysis <br /> or computations of the downstream section,but it can be provided as an additional service. <br /> The Consultant willperform a visual inspection of the upstream contributing basin area of the site and provide an <br /> estimate of the area draining to the site based on available mapping data and site visit observation.This task <br /> does not include a detailed review of upstream basin boundary or land use assessment and any detailed hydraulic <br /> analysis or computations associated with the upstream basin,but,it can be provided as an additional service. <br /> Assumptions: <br /> • The site consists of a single TDA and therefore the Consultant will analyze up to one(1)downstream <br /> route. <br /> • The downstream route field investigation is assuming the Consultant has permission to enter private <br /> properties to conduct the work.If the downstream route field investigation requires access onto private <br /> property,right-of-entry permissions will be obtained by Everett Transit. <br /> Deliverables: <br /> • Offsite Analysis Write-up,to be included in a section of the Drainage Report <br /> 4.4 Change in Land Use Area Map <br /> The Consultant will prepare maps identifying existing and proposed impervious areas.This is used for threshold <br /> determination in accordance with the drainage standards,and to identify mitigation needs for flow control and <br /> water quality treatment.TDA boundaries,based on site topography and conveyance system configuration,will <br /> be identified on these maps.The Consultant will also prepare a summary of area tables for pre-project and post- <br /> project conditions.This task includes updating the proposed impervious area maps after 60%plans are <br /> complete,if there are significant changes to the site design that warrants an update. <br /> Deliverables: - <br /> • Change in Land Use Maps and corresponding table of change in land use areas,to be included in the <br /> . drainage report.These maps will include: <br /> o Existing Impervious Area Maps(1 sheet) <br /> • <br /> o Proposed Impervious Area Maps(1 sheet) <br /> o Tables identifying the different types of impervious surfaces <br /> 7 <br /> • <br /> File location:X:\Everett,City of\Promo Efforts\20170146-Everett Station RIR Expansion\Promo\Business Development\Scope\Everett Transit Parking <br /> Lot_Scope 2018-1-IO.doc 8 <br /> 9 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.