Laserfiche WebLink
yy � <br /> • <br /> f•. 3 <br /> EVERE I I STATION PARK-AND-RIDE EXPANSION <br /> Agreement with Perteet Inc. January 2018 _ <br /> • There are no sensitive areas or buffers on site. <br /> • If retaining walls are required,then WSDOT Standard CIP walls or MSE walls will be specified. <br /> • Irrigation specifications will be performance based for a contractor designed irrigation system.Irrigation <br /> details will be included in specifications.Irrigation plans will be prepared by the contractor.Irrigation <br /> water meter and irrigation controller electric service will be designed by the Consultant. <br /> Deliverables: <br /> • Responses to conceptual design comments <br /> • 60%Plans(four[4]copies,half-size-11"x17") <br /> • 60%Opinion of Probable Cost(four[4]copies) <br /> • 60%Specifications(two[2]copies) <br /> • Electronic version of submittal documents(PDF) <br /> • Summary of Utility Coordination <br /> • <br /> 6.2 100% PS&E (Permit Review Set) <br /> The intent of this task is to progress all elements noted in Task 6.1 to a final condition.The 100%plans are <br /> intended to be construction ready quality submitted to Everett Transit for final review and concurrently submitted <br /> to the City of Everett for permit review.The number of plan.sheets is anticipated to remain the same as the 60% <br /> design effort. <br /> Work Elements: <br /> • Review and address 60%design comments and incorporate into the 100%design.A summary of <br /> comments and actions taken/responses will be provided with the 100%submittal. <br /> • Progress all Task 6.1 elements to a 100%,construction ready state. • <br /> • Ongoing utility coordination. <br /> • Prepare contamindted material specification handling spec based on owner provided hazardous <br /> material investigation prepared by(GeoEngineers). <br /> Assumptions: <br /> • Assume one document submittal for Everett Transit,City of Everett,and other local permits. Documents <br /> will be initially reviewed by Everett Transit,but no second production cycle is anticipated. <br /> • It is assumed that hazardous materials will either be contained on-site and or hauled offsite to a certified <br /> landfill cell.All technical recommendations,documentation,and testing will be performed by client's <br /> hazardous material expert(GeoEngineers). <br /> Deliverables: <br /> • Response to 60%comments <br /> • 100%Plans(six[6]copies,full size for permit submittal). <br /> • 100%Plans(four[4] copies,half-size-11"x17") <br /> • 100%Opinion of Probable Cost(four[4]copies) <br /> • 100%Specifications(two[2]copies) <br /> 13 <br /> File location:X:\Everett,City of\Promo Efforts\20170146-Everett Station P&R Expansion\Promo\Business Development\Scope\Everett Transit Parking <br /> Lot_Scope1018-1-10.docx 9 5 <br />