Laserfiche WebLink
- , Y,-1 ' 4 p,, , k INVOICE: f <br /> , \ 'Why Gamble? Call Campbell!" General Contractor License#:CAMPBPI917MS <br /> % P.O Box 5541, Everett,WA98205 INVOICE DATE January 3,2015 <br /> ,' a. s S_ 360653-9804 PHONE NUMBER 425-293-3000 <br /> F :425-335-43W EMAIL ADDRESS a 1 <br /> e <br /> Email: rvice( c 11pbe is-p um-n ing.c al CUSTOMER ORDER# Karen Knapp <br /> JOB NAME/NUMBER <br /> web:: w .catnphe11 -,olumbin .co r� 01412 003 <br /> JOB LOCATION 1702a Cedar St. <br /> ISVAC-Sewers-Drywall«Water Damages rat , Everett,WA 98201 <br /> TO Karen Knapp JOB PHONE 425-293-3000 <br /> 8915 Corbin Dr. CUSTOMER NAME Karen Knapp <br /> Everett,WA 98204 STARTING DATE December 2,2014 <br /> 3105 <br /> QTY. MATERIALS PRICE AMOUNT DESCRIPTION OF WORK <br /> 1 Rectorseal 4"PVC clean check valve $139.38 Inspect property for backwater valve qualification. Video scope <br /> 1 6"PVC DWV FIP adapter $16.87 sewer line. Perform electronic locate to determine possible locations <br /> 1 6"PVC DWV MPT plug $8.45 to install backwater valve. Mark location,mark out for utility locate <br /> 10 Feet 6°PVC 40 pipe $73.58 and call to have utilities located. Excavate as necessary to access <br /> 10 Feet 4"PVC 40 pipe $41.85 sewer line. Have sewer line grade inspected by city of Everett. <br /> 1 NDS 10"Round valve box $11.53 Remove and/or reroute lines tying into sewer as required by city <br /> 1 NDS 10"Round valve box cover $9.14 and/or requested by customer. Cut into sewer line and bed with <br /> 2 4"Fernco coupling $6.85 $13.70 318"minus crushed rock,install backwater valve including a few <br /> 0.25 Yard 5/8 minus crushed rock $7.50 feet of sewer pipe as needed Have inspected by city of Everett. 1 <br /> * PVC cement $2.50 Backfill,install BWD cover,restore surface of the ground as needed. t <br /> * PVC primer $2.50 Show owner how to operate BWD have paperwork filled out. <br /> 4 Gloves-dig and sanitary $8.75 $35.00 OTHER CHARGES AMOUNT <br /> * Tarps $15.35 Video sewer line $350.00 <br /> * Concrete if needed Included Electronic locate $250.00 <br /> Permitting $30.00 <br /> CA( kl) fig e *Excavator if needed Included <br /> *Diamond saw If needed Included <br /> 3''' .\i--N, C(.1\ °-\ Un 1 73 :-.1 p t.;tif,Izftllis)a� tee i... t,� <br /> �, fl�i3i:,,.. :',r , <br /> .. <br /> 11\ <br /> Err' ,1``- 6-01r a c°1\ 1 1 i li 1 .- TOTAL OTHER $392.03 <br /> J ` <br /> ,, LABOR HRS. RATE AMOUNT <br /> TOTAL MATERIALS $377.35 Excavation,installation&filling 16 $95.00 $1,520.00 <br /> JOB DETAILS AND REMARKS <br /> 1 <br /> 1.5%INTEREST PER MONTH ON ANY BALANCE OVER 30 DAYS <br /> IF THIS MATTER IS PLACED IN THE HANDS OF AN ATTORNEY FOR COLLECTION,WITHOUT REGARD TO WHETHER SUIT IS <br /> INSTITUTED,PURCHASER HEREBY AGREES TO PAY A REASONABLE ATTORNEY FEE FOR THE COSTS OF COLLETION OF p <br /> THIS ACCOUNT.BECAUSE IT'S IMPOSSIBLE TO ESTIMATE COL ECITON COSTS,THE BELOW SIGNED HERFAY PROMISES TO I <br /> PAY A MINIMUM OF 8500 AS UQUIDATED DAMAGES FOR COSTS OF COLLECTION. TOTAL LABOR $1,520.00 <br /> DATE COMPLETED: December 4,2014 TOTAL MATERIALS $377.35 <br /> Work ordered by: Karen Knapp TOTAL OTHER $392.03 <br /> Signature: `i,C�?7% iJ�/,,/ 9.2%TAX $210.62 <br /> I hereby acknowledge the satisfactory completion of the work described above. c TOTAL $2,500.00 <br /> I <br />