My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Warren Stoeckel 2/6/2018
>
Contracts
>
6 Years Then Destroy
>
2018
>
Warren Stoeckel 2/6/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2018 9:40:29 AM
Creation date
2/8/2018 9:40:23 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Warren Stoeckel
Approval Date
2/6/2018
End Date
12/31/2018
Department
Administration
Department Project Manager
Pipa Escalante
Subject / Project Title
Video Production for Everett Channel
Tracking Number
0001054
Total Compensation
$5,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PXIlD3IT A <br /> SCOPE OF SERVICES <br /> Video Production Services <br /> • <br /> General: <br /> The contractor shall receive general direction from the designated city representative based on the <br /> project schedules established by the City.The work includes close coordination and interaction <br /> with the public and City of Everett staff, Work in the field is expected. <br /> Work may include but is not limited to assistance in producing in-house studio programs and <br /> remote location recording of special events.Equipment setup,operation and tear down, <br /> Video/Technical Directing, camera operation and video editing is included in this scope of work. <br /> Work is reviewed for quality and results obtained by Everett TV representative. <br /> Compensation and Pay Requests:The contractor shall be compensated at a rate of$25 per hour <br /> for work completed on assigned tasks.The contractor shall submit requests for payment to the <br /> designated city representative identifying the date period and hours of effort on assigned tasks. <br /> Pay requests shall be accepted no more than once a month and are to be submitted to the City on <br /> or before the 511'day of each month. <br /> Schedule:The schedule shall be developed by the City of Everett TV representative <br /> for eaoh task,Schedule may include evening and weekend assignments <br /> • <br /> Stl1Common\Everett 7VIProfessfonat ServIceslScope of ServfceslScope Vfdeo Productlon,doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.