Laserfiche WebLink
41111111140,-A <br /> stai INSPECTION REPORT <br /> Date: 77 1w ) ) l7 Permit: C I`J) Z — 00 <br /> \.oCY-\'" Contractor: <br /> \ \ `k1 all <br /> Site Address: SV✓v1 W1 1- AV e- <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Grounding El Insulation ❑ Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final as Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: V r �' 2> 190b <br /> ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ;/%A.411fROVAL❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> El OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: _ <br /> El CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> I IIP <br /> Inspector. Date: t i lft <br /> EIR(4/09) i 1: f P-I./37r4 eF ,.,&Pal ,..125/4118-8900 <br />