Laserfiche WebLink
INSPECTION REPORT <br /> 1#41Pz_s/;-a- LI <br /> #1g‘*44W Date: 114 Permit: 0 /i _ — _! <br /> Contractor: 75— <br /> I V ��.4 "I <br /> Owner: , 0 /`V ul/AAA ,A 7 L <br /> .41 <br /> Site Address: 12 OZ SjAJfl is► 1 l,/r Q <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑ Rough In <br /> cool" _4 e' ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> i_ ough In ❑Structural Slab ❑OK to insulate <br /> CIOK to insulate <br /> a S II ❑Framing ❑ Rooftop Units ❑Water Service <br /> ■ r. ii- ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> • c T _•NSULTATION: <br /> PROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T. a. ❑ CORRECTION REQUESTED 1=1ii '- 111.O. VIOLATION <br /> El UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> JJ <br /> (')V...._ kWu..6 Wt &.-E r-ru&J1( _ clievicc <br /> / <br /> • <br /> Inspector: A____ Date: �J ! <br /> EIR(4/09) �1 f ri NATiw7. ORMS&PROMOTIONS•425/480-89011 <br />