Laserfiche WebLink
Page 3r ,��,) <br /> Work Activity Work Order <br /> 5/3/2b17 1:6:10 <br /> Issued By SJT2 SPOONER,JAMES T. <br /> Issued Department PW PUBLIC WORKS <br /> Date Issued 4/27/2016 <br /> Fund 401 Account 5 Program 710 Function 119 Activity 664 <br /> Program <br /> Title SO.75 INCH 2102 SUMMIT AVE 71011966 <br /> Work Order No 20161208 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br /> Status 4/27/2016 Time 10:17 Original WO Billing <br /> Vehicle Costs <br /> Type Vehicle No Description Hours Cost Billing Date Billing Code Warehouse <br /> ✓ J0046 1999 STERLING 5 YARD DUMP 4 68.8 05/17/2016 <br /> ✓ M0043 2003 TIGER VACTOR 4 38.8 05/17/2016 <br /> ✓ J0135 2016 FORD F550 XL EXTENDED CAB 4 46,12 05/17/2016 <br /> ✓ J0093 09 INTERNATIONAL REAR DUMP 4X2 3 58.2 05/24/2016 <br /> ✓ 0249 2014 FORD F150 XL EXT CAB 4X2 3 17.7 05/24/2016 <br /> ✓ 0263 2015 FORD F150 1/2 TON PICKUP 1 6.73 05/24/2016 <br /> ✓ J0128 2015 FORD F550 XL 4X2 1.5 TON 3 29.49 05/24/2016 <br /> Total Vehicle Cost $265.84 <br /> Material Costs Billing <br /> Type Mater No Description Quantity Cost Date War <br /> M ADAP34145347 ADAPTER 3/4 MIP X 1 IPS INSTA-TITE 1 25,627 05/17/2016 PAP <br /> M ADAP34000547 ADAPTER 3/4 MIP X 3/4 IPS INSTA-TITE 1 15.831 05/17/2016 PM <br /> M 60X000154347 BOX METER MOLDED PLASTIC W/DI LID 11"X 18" (SMALL) 1 71.275 05/17/2016 PAP <br /> M CORP34001847 CORP STOP 3/4 CCT X 3/4 COPPER FLARE X 3/4 IPS INSTA-TITE 1 43.752 05/17/2016 PAP <br /> M ELL034104247 ELBOW 3/4 NPT 90 DEG STREET BRASS(1/4 BEND) 1 4.99 05/17/2016 PM <br /> M METE34141847 METER 5/8 X 3/4 NEPTUNE W/E-CODER R9001 CU FT STUB ANTENNA 1 189.971 05/17/2016 1 PAP <br /> M PIPE34060647 PIPE 3/4 POLY IPS 200 PSI SIDR7 ASTM D2239 12 3.792 05/17/2016 PM <br /> M SADD44016847 SERVICE SADDLE 6 W/3/4 CC TAP FOR 6 DI 6.63-7.60 1 19.786 05/17/2016 PAP - <br /> M SETT34033647 SETTER COPPER 5/8 X 3/4 HEIGHT 12"LEG LENGTH 15"VUHO 1 157.72 05/17/2016 PM i <br /> Total Material Cost $532.75 <br /> NA Costs <br /> Type Na No Description - Quantity Cost Billing Date War <br /> NA N/A 3/4 MINUS GRAVEL 1 23.08 05/17/2016 • <br /> NA N/A TRACING WIRE 14 2.1 05/17/2016 <br /> NA N/A CONCRETE(CEMEX) 1 53.51 06/10/2016 <br /> Total NA Cost $78.69 <br /> Personnel Costs <br />