My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3410 TERMINAL AVE 2018-03-09
>
Address Records
>
TERMINAL AVE
>
3410
>
3410 TERMINAL AVE 2018-03-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2018 4:05:53 PM
Creation date
2/9/2018 11:46:48 AM
Metadata
Fields
Template:
Address Document
Street Name
TERMINAL AVE
Street Number
3410
Notes
GEOTECHNICAL REPORT INCLUDED
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iNf <br /> GEOTECHNICAL REPORT <br /> PORT OF EVERETT <br /> tSOUTH TERMINAL WHARF UPGRADES FOR Ro/Ro <br /> EVERETT,WASHINGTON <br /> 1.0 INTRODUCTION <br /> This geotechnical report presents the results of our geotechnical engineering studies for the Port <br /> of Everett's (Port's) South Terminal Wharf Upgrades for Ro/Ro project located in Everett, <br /> Washington. The purpose of our work is to support Moffatt&Nichol in its design to upgrade <br /> the concrete cargo dock to allow for higher load capacity. <br /> ' The information and recommendations presented in this report are intended to provide the design <br /> team with the geotechnical recommendations needed to prepare bidding documents. Included in <br /> ' this report are a site and project description, a discussion of the completed geotechnical <br /> exploration,the interpreted subsurface soil and groundwater conditions, geotechnical <br /> engineering recommendations for pile design, and construction considerations for pile driving. <br /> The work included in this report was conducted in general accordance with the scope of work <br /> related to the wharf upgrade outlined in our proposal dated January 29, 2014, and as outlined in <br /> our subcontract with Moffatt&Nichol (MN) executed on March 24, 2014. Based on discussions <br /> with MN,the scope of work in the original proposal was modified to include an evaluation of the <br /> ' existing wharf piles and a reduction in the number of deep borings from two to one. This change <br /> in scope was effective beginning April 2014 and resulted in a net zero change in budget. Work <br /> related to the portion of the scope addressing the rail upgrade will be presented in a separate <br /> ' report as directed by MN. <br /> 2.0 SITE AND PROJECT DESCRIPTION <br /> ' Thero'ect is located at the Port's South Terminal wharf as shown in the VicinityMap,J Fi gure 1. <br /> ' Our understanding of the project is based on discussions with and drawings provided by MN <br /> which is summarized as follows: <br /> I .' <br /> The portion of the South Terminal wharf that is to be upgraded is located between <br /> pile rows 27 and 35, as shown in the site and exploration plan,Figure 2. <br /> 1 <br /> ' 21-1-21962-003-R2.docx/wp/cp 21-1-21962-003 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.