My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000 TOWER ST INDEX HALL 2018-02-09
>
Address Records
>
TOWER ST
>
2000
>
INDEX HALL
>
2000 TOWER ST INDEX HALL 2018-02-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2018 12:01:51 PM
Creation date
2/9/2018 12:01:42 PM
Metadata
Fields
Template:
Address Document
Street Name
TOWER ST
Street Number
2000
Tenant Name
INDEX HALL
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
al 111 <br /> Ap... PUBLIC WORKS PERMIT Date: 7/13/2015 <br /> Public Works Permit#: PW1507-025 <br /> City of Everett Public Works Departmenttig Building Permit#; <br /> 3200 Cedar Street <br /> Everett, WA 98201 Planning Reference#: <br /> (425) 257-8810 <br /> Public Works Fee $: $ 424.13 <br /> Other $: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> WASHINGTON STATE UNIVERSITY HOFFMAN CONSTRUCTION <br /> 110K FACIL OPS 1500 WESTLAKE AVENUE, <br /> VANCOUVER WA 98686 §P),\ rER WA 98109 <br /> PHONE: 3605469237 PHONE: 2069731700 <br /> TAX PARCEL ID# 29051700201800 SITE ADDRESS: 2000 TOWER ST <br /> DESCRIPTION OF PROPOSED WORK: <br /> GRADING &TEMP GRAVEL PRK <br /> (7/13/2015 1:22 PM SEF) <br /> Regrading and installation of a temporary gravel surface lot for approximately 83 vehicles. <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. Site Civil Work to be done per plans and drainage report approved by the City of Everett Public Works <br /> Department dated 8/18/2015. w <br /> 5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior to starting construction I"I <br /> CA <br /> and with other inspection requests. See attached to request and inspection. <br /> Pq <br /> 6. Provide any necessary Erosion control for this project as directed by the City Public Works Inspector. C <br /> Public Works Fee Breakdown: n � <br /> PW Plan Review$126.38 3 6 C —\ O <br /> U <br /> PW Site Inspection $252.75 <br /> Parking Lot Paving $45.00 -•-�rg , V, t1IF,,a AUG 1 9 2015 <br /> [1 <br /> li <br /> IL <br /> C <br /> 1 O� J.VE-:. F+q <br /> . DEC 1 3 201 °erre ,ices <br /> CITY OF EVERETT <br /> Permit Services <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and <br /> save harmless the City of Everett from any and all claims for <br /> damages, costs, expenses, or causes of action that may arise <br /> because of installation and maintenance of the improvement <br /> rI / I GL` 3—17-15 or other right-of-way use hereto applied for and further agrees <br /> to remove same upon notice from the City and to replace <br /> App•.ve• for,Constr ti• Date public propey damaged thereby. <br /> f � qi "—.,'IN�LINSD.� CTION Date � <br /> Approved as Constructed Signa`ture ofjApplicant Date <br /> i <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLL I ION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90,aDAYS <br /> �DURATION. <br /> P2"4 f -If.t t(J of a49! <br />
The URL can be used to link to this page
Your browser does not support the video tag.