My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4966 VESPER DR 2018-03-09
>
Address Records
>
VESPER DR
>
4966
>
4966 VESPER DR 2018-03-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2018 4:09:47 PM
Creation date
2/9/2018 2:37:12 PM
Metadata
Fields
Template:
Address Document
Street Name
VESPER DR
Street Number
4966
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r • <br /> 114P <br /> L_`- T <br /> `LI <br /> 0100 amp bus/100 amp main OCPD- 3,840 AC watts,maximum 20 amp Inverter OCPD. <br /> DOther-Electrical Permit with Plan Review Required • <br /> Note 1:listed un-altered factory main/bus combination.Alteration of the panelboard main OCPD will require plan review. <br /> Note 2:The circuit conductors and overcurrent devices shall be sized to carry not less than 125 percent of the maximum currents <br /> ds calculated in 690.8(A).The rating or setting of overcurrent devices shall be permitted In accordance with 240.4(B)and(C).NEC <br /> 690.8(B)(1) <br /> Note 3:if a panelboard employs a snap switch rated 30 amperes or less in any branch circuit,it cannot be rated more than 200 <br /> amperes unless there is a supply side overcurrent protection at 200 amperes or less within the panelboard.This requirement does <br /> not apply to panelboards equipped with circuit breakers.Section 408.36(A)of the NEC. <br /> 7. 1 have attached the following Electrical One-Line Diagram: <br /> ❑Standard Electrical Diagram-6 Strings or Less <br /> ❑Standard Electrical Diagram-4 Strings or Less <br /> Standard Electrical Diagram-Micro inverter <br /> ❑None of the above-Electrical Permit with Plan Review Required • <br /> Comments: J . <br /> F If you answered yes to all of the above questions,your project qualifies for over the Over-the- <br /> Counter electrical permit. <br /> - <br /> I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws <br /> and ordinances governing this type of work will be completed whether specified herein or not. The granting of a permit does <br /> not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the <br /> performance of construction. That I am authorized by the owner of this property to perform the work for which application Is <br /> made and I comply with the State Contractors Law 18.27 RCW and 296.200 WAC. <br /> / / <br /> Applicant 5ignatur %" Date: 3/he/17 <br /> i <br /> Applicant Name(Please peir <br /> -TO BE COMPLETED BY CITY STAFF • <br /> Qualifies for OTC Building Permit? DYes DNo Permit Application II: <br /> Staff Initials Date: <br /> Qualifies for Electrical OTC? DYes ❑No Permit II: <br /> Staff Initials Date: 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.