Laserfiche WebLink
• • <br /> Residential Photovoltaic OTC Permit Application <br /> Contractors can apply for an Over-The-Counter(OTC)permit where the PV system meets the requirements listed <br /> . . in this Checklist.All project plans and supporting documentation must be provided on site for the Inspector. <br /> BE COMPLETED BY APPLICANT <br /> • <br /> 0 Project Information <br /> Property Owner Name: tier-- <br /> Project Address: 9 6 6 c? .zr-b r Parcel# <br /> City:z / €.1 State: (.A14 ZIP: W1)z3 <br /> Day Phone: qZ _30 _023 c, <br /> Contractor Name ner-3 S y <br /> Contractor License#: SU ver-5i c75- <br /> .Contractor <br /> SContractor Day Phone: Z06 S7/ - 7 a <br /> PV system description �« [ r- f, p 1,0}7i V c')) 1-ca t c_ U Si vi <br /> (Include manufacturer (�S <br /> and model#of PV 3dCr� <br /> O /i-K- Zr3oo-SE ,i 4~ <br /> modules and131u�l-ggo micro -j J 2 �e /S — A-0 at._ <br /> inverters): 4i. <'p w r <br /> ()Determine if your[project qualifies for expedites) permitting: <br /> Yes No <br /> 1. PV system is designed and proposed for a detached one-or two-family dwelling or <br /> townhouse not more than three stories above grade or detached accessory structure that K ❑ <br /> Is code compliant to setbacks and height,or code allows expansion of nonconformity for <br /> solar modules. [IRC 101.2] <br /> 2. Modules on pitched roofs do not exceed the highest point of the roof unless approved by ❑ <br /> the local jurisdiction. <br /> 3. Rooftop is made from lightweight material such'as a single layer of composition shingles, ❑ <br /> metal roofing,lightweight masonry,or cedar shingles. <br /> 4. The Installation shall comply with the manufacturer's instructions,[IRC M23012) O <br /> 5. The installation shall meet the requirements of NFPA 70 National Electric Code,and all <br /> required electrical permit(s)must be obtained from the Authority Having Jurisdiction to ❑ <br /> administer the electrical code.[IRC M2302.21 <br /> 6. The Installation shall meet the requirements of the International Fire Code as amended rcr <br /> by WA State,f IRC M2302.21 <br /> 7. The PV system is designed for the wind speed of the local area,and will be installed per PI <br /> the manufacturer's specifications. [IRC M2302,2.1(1)) <br /> 8. The ground snow load does not exceed 70 pounds per square foot.[IRC M2302,2.1(2)] X •❑ <br /> 9. Total dead load of modules,supports,mountings,raceways and all other appurtenances <br /> weigh no more tharrfour pounds persquare foot.[IRC M2302.2.1(3)] ' O <br /> Enter total dead load of system(lbs/ft2): 7-.Y <br /> 10. To address uplift,modules are mounted no higher than 18"above the surface of the 1:1roofing to which they are affixed.[IRC M2302,2.1(4)) <br /> P3 1 <br />