Laserfiche WebLink
INSPECTION REPORT l�- ! <br /> �p,,,,. <br /> ';'N''N/I4411Millir''''r Date t Z Permit: �2".sOq -- oc`I <br /> Contractor: _ <br /> Owner: L1 ''-- <br /> Site Address: I tOS v C-c_TZ - <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grou'ding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> •C-= ng Grid ❑Drywall Nailing ❑Plumbing Final <br /> ►r, lectrical Final ❑Shear Nailing GAS PIPE <br /> E WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final-- c ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: Z-0(e �7 C.0 'O f(. <br /> in A PPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> iI •K FOR T.C.O. ❑ CORRECTION REQUESTED <br /> 71] <br /> • OK FOR C.O. ❑ VIOLATION <br /> • UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> 10 �-- --- <br /> T------"<"^-=.--"--- —-.., <br /> / <br /> Inspector: f _ Date: <br /> EIR(10/06) DATABAR,INC. <br />