My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4958 VISTA PL 2018-02-09
>
Address Records
>
VISTA PL
>
4958
>
4958 VISTA PL 2018-02-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2018 3:42:17 PM
Creation date
2/9/2018 3:42:11 PM
Metadata
Fields
Template:
Address Document
Street Name
VISTA PL
Street Number
4958
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Matvey Foundation Repair,Inc. <br /> Phone: <br /> eB53- 27ck-1650Solid" � � � � FOUNDATION <br /> Phone:253-327-1b50 � <br /> 1912 S 146th Street Seatac WA 98168 REPAIR <br /> www.matveyconstruction.com <br /> engineering@matveyfoundationrepair.com <br /> Erin and Mike Packer <br /> 4958 Vista Place <br /> Everett,WA 98203 <br /> Atm: Erin and Mike Packer <br /> Date: 1-23-2017 <br /> Site address: 4958 Vista Place,Everett <br /> FINAL LETTER <br /> This report addresses the pier installation at the above mentioned address. Push piers were placed to <br /> stabilize the house foundation and attempt to lift. The pier log was kept by the crew during installation as <br /> follows: <br /> Pier ID Pile Depth,ft Gauge Pressure,psi <br /> 1 9 4,000 <br /> 2 12 4,000 <br /> 3 12 4,000 <br /> 4 12 4,000 <br /> 5 15 2,500 <br /> 6 15 2,500 <br /> 7 --__ 12 3.000 <br /> 8 12 2,500 <br /> Data provided by installation crew <br /> No portion of the structure was enlarged or replaced. The push piers were attached directly to the <br /> foundation and therefore no closer to any critical area. The scheduled work did not have any negative <br /> impacts to the site or the surrounding areas. Installation of the push piers increased the overall safety of <br /> the slope by transmitting the footing loads deeper and thereby reducing stress to the slope. <br /> All piers were installed per the manufacturers recommendations and specifications. <br /> If you have any questions,p1- -*eEfret'.to I tact us at 253-327-1650. <br /> � t}' \1:ts 1{f <br /> / r <br /> Ir.. <br /> Jason Bell, PE /4.*-. <br /> T1;1 <br /> i.. <br /> • <br /> oPTIoNsa <br /> F OUNOA TION G ® PL y <br /> SUPPQRTWORKS y ILA INOMPARMI41114.Y <br />
The URL can be used to link to this page
Your browser does not support the video tag.